Tenders Are Invited For Integrated Engineering Services - Preparation Of A Complex Report For The Assessment Of Compliance With The Main Requirements For Construction And Technical Control For The Constructive Part Of The Site: Road Iii-133 Gr. Opu-Vratsa-Septemvriytsi-Valchedrum-Mokresh- (Montana-Lom District) From Km 36+368 To Km 70+349
Tenders Are Invited For Integrated Engineering Services - Preparation Of A Complex Report For The Assessment Of Compliance With The Main Requirements For Construction And Technical Control For The Constructive Part Of The Site: Road Iii-133 Gr. Opu-Vratsa-Septemvriytsi-Valchedrum-Mokresh- (Montana-Lom District) From Km 36+368 To Km 70+349
Integrated Engineering Services - Preparation Of A Complex Report For The Assessment Of Compliance With The Main Requirements For Construction And Technical Control For The Constructive Part Of The Site: Road Iii-133 Gr. Opu-Vratsa-Septemvriytsi-Valchedrum-Mokresh- (Montana-Lom District) From Km 36+368 To Km 70+349. Preparation Of A Comprehensive Report For The Assessment Of Compliance With The Main Requirements For Construction And Technical Control On The Constructive Part Of The Presented Technical Project In Accordance With Art. 142 Of The Zut. Approval Of The Bill Of Quantities And/Or The Bill Of Quantities (Bco), An Integral Part Of The Technical Project Prepared By The Contractor Under The Contract. All Documents - Graphic And Textual - Of The Investment Project Are Signed And Stamped By The Relevant Qualified Specialist And By The Manager Of The Legal Entity Or By The Sole Trader Consultant Who Performed The Conformity Assessment. All Other Obligations Necessary For The Implementation Of The Subject Of The Public Procurement, Specified In This Documentation And Its Appendices, As Well As Those Specified In The Contract And Legal Provisions. The Contractor Must Prepare And Submit To The Contracting Authority The Complex Report For Assessing The Compliance Of The Investment Project With The Existing Requirements For Construction, Including Technical Control On The Constructive Part, Based On The Project Documentation Presented By The Contracting Authority, Necessary For Its Preparation. A Project Has Been Developed For The Repair Of Rp Iii-133 Opu-Vratsa-Septemvriitsi-Valchedrum-Mokresh-(Montana-Lom District) From Km 36+368 To Km 70+349, With The Beginning Of The Road Section - At Km 36+368 - Opu-Vratsa Town And The End Of The Section - At Km 70+349 At The Intersection With Rp-81. The Investment Project Is Developed In The Following Parts: Part 2. Plans Part 4. Road Pavement Design Part Geology; Hydrology And Hydraulics Part Fire Safety Part Initial Data The Roads Design Speed Is 70 Km/H.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.