Installation Of Small Metal Structures Weighing Up To 10 Kg, Metal Constructions (Pipeline Girder Or Hangers), Laying Of Overhead Steel Gas Pipelines On Metal Supports, Gas Pipeline Diameter 300 Mm, Cleaning The Pipeline Cavity With Air Blowing, The Conventional Diameter Of The Gas Pipeline Is 300 Mm, Conditional Diameter Of Pressure Rise During Air Testing Of Gas Pipelines At Low And Medium Pressure (Up To 0.3 Mpa) 300 Mm, One-Time Priming Of Metal Surfaces With Xs-068 Primer (2 Layers Of Gas Belts And Case), Painting Primed Metal Surfaces With Xv-7141 Treatment (2 Layers Of Gas Belts And Case), Excavation Of The Soil By Throwing The Soil Outside The Trenches With Backhoe Excavators With A Bucket Capacity Of 0.5 (0.5-0.63)M3, Soil Group 3, Manual Digging Of Soil In Sloped Trenches Up To 2 M Deep Without Fasteners Soil Group 3 (Cleaning), Manual Filling Of Ditches, Hollows And Pits Soil Group 2 (Under And Above The Pipe), Filling Pits And Trenches With Bulldozers By Moving The Soil Up To 5 M, Bulldozer Power 59 (80) Kw (A.G) 2Nd Group Soil, Mechanized Planning Of Fields, Soil Group 2, Laying Pipelines From Polyethylene Pipes With A Diameter Of 315 Mm, Laying Of Steel Water Pipelines By Hydraulic Testing, Pipe Diameter 400 Mm (Vertical Footer), Laying Reinforced Insulation Of Polymer Tapes With Anti-Corrosion Adhesive To Steel Pipelines, Diameter Of Pipes 400 Mm
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.