GTR 113958882
Tenders Are Invited For Installation Services Of Measuring Equipment - Ensuring The Proper Functioning Of Pump Stations - Adaptation Of Measurement Systems To The Requirements Of Energa Operator At Pump Stations In The Area Of Operation Of Zz In Elbląg
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
113958882
Tendering Authority
Subscribe to view
Tender No
372359-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Installation Services Of Measuring Equipment - Ensuring The Proper Functioning Of Pump Stations - Adaptation Of Measurement Systems To The Requirements Of Energa Operator At Pump Stations In The Area Of Operation Of Zz In Elbląg
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
06-07-2026
Closed
Work Detail
Installation Services Of Measuring Equipment - Ensuring The Proper Functioning Of Pump Stations - Adaptation Of Measurement Systems To The Requirements Of Energa Operator At Pump Stations In The Area Of Operation Of Zz In Elbląg. 1. The Subject Of The Order Is The Provision Of A Service Called Ensuring The Proper Functioning Of Pump Stations - Adaptation Of Measurement Systems To The Requirements Of Energa Operator At Pump Stations In The Area Of Operation Of Zz In Elbląg. The Purpose Of The Task Is To Adapt The Electricity Measurement And Billing Systems Installed At 10 Pump Stations Located In The Area Of Operation Of Zz Elbląg To The Requirements Of Energa Operator Contained In The Instruction For Operation And Operation Of The Distribution Network (Iriesd) P. Ii.4.7.1 And P. Ii.4.7.3. Available On The Website Of Osd Energa Operator S.A. The Reconstruction Of The Measurement Systems Involves Replacing Semi-Indirect Systems With Energy Measurement On The Lv Side With Indirect Systems With Energy Measurement On The Mv Side, Equipped With Current And Voltage Transformers In All Three Phases. Scope Of Work: 1) Preparation And Approval Of Documentation Regarding The Measurement System With The Distribution System Operator Energa Operator In Accordance With The Requirements Of Iriesd. 2) Reconstruction Of The Measurement System Based On The Documentation Agreed By The Contractor With The Distribution System Operator. All Materials Necessary To Rebuild The Measurement System And The Costs Of Disconnecting The Voltage For The Duration Of The System Reconstruction Are Borne By The Contractor. 3) Carrying Out Control And Measurement Works Along With Measurement Protocols. 4) A Detailed Description Of The Subject Of The Order And The Terms Of Execution Of The Order Are Specified In: - Description Of The Subject Of The Order (Opz) - Annex No. 1 To The Swz, - Draft Provisions Of The Contract (Ppu) - Annex No. 8 To The Swz 2. Deadline For Order Completion Is Up To 60 Business Days From The Date Of Conclusion Of The Contract. The Order Completion Date Is One Of The Offer Evaluation Criteria, Which Is Specified In Detail In Point 15 Of The Tor.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d8070347-c455-44cb-8cb8-f69fd6a43c0c.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.