We Are Asking For Your Offer For The Demolition Work Of The Lämsänjärvi Kindergarten, Completed According To The Attached Documents. The Work Will Be Carried Out As A Subcontract And The Customer Will Act As The Main Contractor And The Main Contractor. Address: Lämsänjärventie 1590230 Oulu Contents Of The Work The Work Will Be Carried Out In Accordance With The Attached Planning Documents, With The Following Details: Demolition Of Floors By Structural Type According To Apx1-Apx4, Demolition Of False Ceilings And Acoustic Panels For Roofs To Be Renewed, Making Holes And Openings In Brick/Concrete Walls And Plinths. Concrete Openings In The Lower Base According To The Plans. Demolition Of The Waterproof Roof. The Demolition Work Includes: Waterproofing (Fiber Cement Corrugated Roofing (So-Called Vartti Roofing, Found To Contain Asbestos)) Mineral Wool For The Upper Foundation. Demolition Of The Waterproof Roof Is Carried Out In A Weather Shelter In Three Stages. The Phasing Is Shown In The Ark Station Drawing (Racks + Weather Protection, Updated 20.5.2026). Kitchen Facilities The Contract Includes: All Demolition Work Related To The Kitchen, Including Refrigerators. Demolition Of Contaminants• Demolition Of Contaminants Is Carried Out Up To A Clean Surface (Including Vacuuming And Other Necessary Cleaning Measures)________________________________________The Contract Does Not Include• Demolition Of Building Technology• Demolition Of Partition Walls• Demolition Of Doors• Dismantling Of Furniture And Equipment To Be Stored And Removed• Dismantling Of Kitchen Machines And Equipment• Demolition Of Water Roof Clapboards, Risers And Underlay ________________________________________ Schedule Contract Time: July 2026 – September 2026 Phasing – Demolition Of The Water Roof • Phase 1: Start From 1 July 2026 • Phase 2: Start From 15 July 2026 • Demolition Of Phases 1 And 2 Completed By 31 July 2026 At The Latest • Phase 3: Start From 29 July 2026 • Complete Demolition Of The Water Roof At The Latest: 21.08.2026 Demolition Of The Inside Will Be Carried Out According To The Progress Of The Construction Site____________________________ Occupational Safety Special Attention Is Paid To Occupational Safety:• All Work Must Be Carried Out In Accordance With The Valid Occupational Safety Regulations, Or Quartz Dust Must Be Taken Into Account In The Work. The Demolition Contractor Prepares A Demolition Work Plan And Has It Approved By The Customer Before Starting The Work.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.