GTR 113940351

Tenders Are Invited For Construction Work For Water Projects - Reconstruction Of The Reservoir In The Lubomierz Forestry In Section 99, As Part Of The Project Entitled: Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Mountain Areas - Continuation (Mrg3)

ICB — International Competitive Bid central europe
Tender Information
GTR Reference
113940351
Tendering Authority
Subscribe to view
Tender No
381803-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work For Water Projects - Reconstruction Of The Reservoir In The Lubomierz Forestry In Section 99, As Part Of The Project Entitled: Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Mountain Areas - Continuation (Mrg3)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
10-07-2026
Work Detail
Construction Work For Water Projects - Reconstruction Of The Reservoir In The Lubomierz Forestry In Section 99, As Part Of The Project Entitled: Comprehensive Project For The Adaptation Of Forests And Forestry To Climate Change - Small Retention And Counteracting Water Erosion In Mountain Areas - Continuation (Mrg3). The Subject Of The Order Is The Construction Of A Hydrotechnical Structure, Which Includes A Retention Pond With Earthen Dikes, An Intake On The Lubomierka Stream And A Damming And Drainage Monk. An Integral Part Of The Facility Are Also Accompanying Devices, Such As Culverts, Intake And Discharge Pipelines, And A Water Intake Station For Fire Protection Purposes. And Railings. The Most Important Technical Parameters Characterizing The Hydrotechnical Structure Are: • Usable (Retention) Capacity At The Normal Damming Level (Npp): 13,250 M³ • Damming Height In The Pond: 2.0 M • Damming Height Of The Penstock On The Lubomierka Stream (Intake): 0.8 M Other Technical Parameters Of The Pond: • Total Area Of The Pond Bowl: Approx. 1.1 Ha, • Dimensions Of The Bowl (Inscribed In A Rectangle): Approx. × 133 M, • Flood Capacity (With Overpressure): Approx. 16 Thousand M³, • Average Water Depth At Npp: Approx. 1.6 M, • Length Of The Dike: Approx. 185 M, • Width Of The Dike Crown: 3.0 M, • Slope Inclination: Max. 1:2 - 1:3. Parameters Important From The Point Of View Of Fire Protection: • Efficiency Of The Water Source: Lubomierka Watercourse, With A Flow Of Over 10 Dm³/S At The Lowest Water Levels, • Water Intake Station: A Hardened Bay With Dimensions Of 4 × 12 M And A Load Capacity Of 100 Kn/Axis, Adapted To Service Rescue And Fire-Fighting Vehicles, • Suction Nozzle: Dn 110, Located At A Distance Of 1.0 M From The Edge Of The Stand, • Suction Depth: ≤ 4.0 M From The Water Surface To The Stand Level. Scope Of Work: 1. Preparatory Works Consisting Of: Mowing Grass; Removal Of Self-Seeded Trees, Clearing Of Bushes, Undergrowth And Tree Trunks, Removal Of Beaver Dams, Environmental Supervision By A Theriologist, Demolition Of Concrete And Wooden Structures, Removal Of Rubble. 2. Reconstruction Of The Ponds Bowl And Earthen Dyke. 3. Reconstruction Of The Damming Gate On The Lubomierka Stream 4. Reconstruction Of The Damming And Discharge Device 5. Construction Of A Station For Drawing Water From The Lubomierka Stream For Fire Protection Purposes. 6. Reconstruction And Construction Of Culverts Under The Forest Road With The Introduction Of Water From Ditches From The Forest Catchment Into The Pond Bowl. Temporary And Auxiliary Works 1. Measurement Works Before The Execution Of Works 2. Drainage Of Excavations 3. Disposal Of Excavated Material A Detailed Description Of The Subject Of The Order Is Specified In The Design Documentation Constituting Annex No. 10 To The Swz, Which Consists Of: - Technical Design, - Land Development Design, - Architectural And Construction Design, - Detailed Technical Specification For The Execution And Acceptance Of Construction Works, - Water Law Report - Administrative Decisions And Arrangements Of The Competent Authorities. All Works Must Be Performed In Accordance With Applicable Laws, Technical Standards And Principles Of Technical Knowledge.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
eca5855d-ce04-49eb-b6fc-fc64c0fc52dd.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders