GTR 113939008

Tenders Are Invited For Engineering Design Services – Preparation Of Design Documentation For The Task Entitled: Expansion Of The A4 Motorway On The Section Dulowa Junction (Without A Junction) - Balice I Junction (Without A Junction)

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
113939008
Tendering Authority
Subscribe to view
Tender No
378379-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Engineering Design Services – Preparation Of Design Documentation For The Task Entitled: Expansion Of The A4 Motorway On The Section Dulowa Junction (Without A Junction) - Balice I Junction (Without A Junction)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
17-06-2026 Closed
Work Detail
Engineering Design Services – Preparation Of Design Documentation For The Task Entitled: Expansion Of The A4 Motorway On The Section Dulowa Junction (Without A Junction) - Balice I Junction (Without A Junction). Preparation Of Design Documentation For The Task Titled: Expansion Of The A4 Motorway On The Section Dulowa Junction (Without Junction) - Balice I Junction (Without Junction), As Well As Support For The Employer At The Stage Of The Tender(S) For Construction Works, Including Providing Explanations And Answers To Bidders, And Performing Authors Supervision During The Implementation Of Works Based On The Prepared Design Documentation. The Investment Planned For Design Includes The Reconstruction And Expansion Of A Section Of The A4 Motorway With A Length Of Approx. 24.0 Km. The Beginning Of The Investment Is Located At The Dulowa Junction Planned As Part Of The Construction Of The Chrzanów And Trzebinia Bypass, I.E. Approximately Km 377+120. The End Of The Existing Section Is Located After The Toll Collection Point In Balice, Approximately Km 401+100. Permits And Decisions, Including Decisions On Environmental Conditions, Notification Of Works, Construction Permits, Zrid Decisions. The Ordered Design Documentation Must Be Prepared To The Extent Necessary To Obtain Its Approval By The Investment Projects Assessment Team. The Investment Will Be Implemented In Two Parts: Part I - Includes The Preparation And Implementation Of The Road Extension Motorways. • Part Iib - Includes The Preparation And Expansion Of The Motorway Junctions, The Engineering And Traveler Service Areas, Together With Its Approval. B) The Subject Of The Order, I.E. The Scope That May Be Commissioned To The Contractor For Implementation Under The Option Law, Includes: A) Design Of Geological Works For The Preparation Of Geological Documentation, Together With Its Approval. Approval C) Geological And Engineering Documentation With Approval D) Hydrogeological Documentation With Approval E) Environmental Impact Report F) Tv Inspection Of The Existing Storm Sewage System Constituting Elements Of Ter - Stage Ia - For Part I And Part Iib Detailed Information On The Options Is Included In The Ppu (Volume Ii Swz).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
af3c505f-1f23-45d1-95fb-8e12236c67c0.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders