GTR 113903847
Quotation Are Invited For E-Station Phase-1, Ge Frame 9E Agp 32K Dln Upgraded Gas Turbine Units, Secondary Fuel Nozzle Refurbishment
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
113903847
Tendering Authority
Subscribe to view
Tender No
2332601256
Financer Name
Self-Funded
Work Title
Quotation Are Invited For E-Station Phase-1, Ge Frame 9E Agp 32K Dln Upgraded Gas Turbine Units, Secondary Fuel Nozzle Refurbishment
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
05-06-2026
Closed
Work Detail
Quotation are invited for 1-E-Station Phase-1, GE Frame 9E AGP 32K DLN Upgraded Gas Turbine Units, Secondary Fuel Nozzle Refurbishment. 1PCS SECONDARY NOZZLE REFURBISHMENTA.4. REPAIRS - 9E FUEL NOZZLES - SECONDARYA.4.1. INSPECTION ONLY# RECEIVE, UNBOX AND VISUALLY INS PECT TO ASSESS OVERALL INCOMINGCONDITION OF SECONDARYFUEL NOZZLES (SFN)# RECORD DRAWING AND SERIAL NUMBERS AND RECORD OF PREVIOUS RE PAIRS, IFVISIBLE/LEGIBLE# PERFORM INCOMING FLOW TEST.# CLEAN COMPONENTS AND BODIES.# PERFORM VISUAL INSPECTIONS OF ALL COMPONENTS (O UTER SLEEVE, OILSTICKS, AND WATER TUBES).RED DYE INSPECT ALL WELDS ON BODIES. DIMENSIONAL INSPECTIONS OF OILSTICK SHROUDS ANDOUTER S LEEVE TIPS.# BACKFLUSH OUTER SLEEVE PILOT PASSAGE.# PERFORM ENGINEERING REVIEW OF LINER INSPECTION RESULTS AND ISSUEINSPECTION/CONDI TIONREPORT.A.4.2. LIGHT REPAIR# REPLACE ALL LIP SEALS.# REPLACE C-SEALS, GASKETS, LOCK RINGS/PLATES.# ASSEMBLE COMPONENTS.# FLOW-TES T GAS PASSAGES/ADJUST.# FLOW-TEST GAS PASSAGES TO IDENTIFY LEAKS ACROSS PISTON RINGS.# FLOW-TEST LIQUID PASSAGES/ADJUST (DUAL FUEL O NLY)# C-SEAL LEAK CHECK ALL COVERS.# FINAL QUALITY CHECKS (VISUAL INSPECTION OF GENERAL CONDITION OFPARTS, FINAL BORESCOPE OFINTERNA L PASSAGES)# PREPARE AND ISSUE FINAL REPORT INCLUDING FINAL FLOW MEASUREMENTS.# PACK IN CONTAINERS AND PREPARE FOR SHIPMENT.A.4.3. M EDIUM REPAIR# REPLACE ALL LIP SEALS.# PERFORM WELD REPAIR INDICATIONS ON UP TO 50% FN BODIES FOUND DURINGRED DYE INSPECTIONS.# REPAI R UP TO 50% OF OUTER SLEEVE TIPS FOUND TO FAIL THE VISUAL ORDIMENSIONAL INSPECTION.# REPAIR UP TO 50% OF OUTER SLEEVE PEGS THAT FAIL VISUAL INSPECTIONS ORFLOWS DURING THE FINALFLOW PROCESS.# REPLACE C-SEALS, GASKETS, LOCK RINGS/PLATES.# ASSEMBLE COMPONENTS.# FLOWTEST GAS PASSAGES/ADJUST.·#FLOW-TEST GAS PASSAGES TO IDENTIFY LEAKS ACROSS PISTON RINGS.·#FLOW-TEST LIQUID PASSAGES/ADJUST (DUAL FUE L ONLY)·#C-SEAL LEAK CHECK ALL COVERS.·#FINAL QUALITY CHECKS (VISUAL INSPECTION OF GENERAL CONDITION OFPARTS, FINAL BORESCOPE OF INT ERNAL PASSAGES)·#PREPARE AND ISSUE FINAL REPORT INCLUDING FINAL FLOW MEASUREMENTS.·#REPLACE BOXES WITH NEW (AS NECESSARY)·#PACK IN C ONTAINERS AND PREPARE FOR SHIPMENT.NOTE: SUPPLY OF PARTS ADDITIONAL TO CONSUMABLES WILL CHARGE AS EXTRAA.4.4.#HEAVY REPAIR·#REPLACE ALL LIP SEALS.·#PERFORM WELD REPAIR INDICATIONS ON UP TO 50% FN BODIES FOUND DURINGRED DYE INSPECTIONS.·#REPAIR GREATER THAN 50% OF OUTER SLEEVE TIPS FOUND TO FAIL THE VISUALOR DIMENSIONAL INSPECTION.·#REPAIR GREATER THAN 50% OF OUTER SLEEVE TERTIARY TIPS THAT FAI LVISUAL INSPECTION.·#REPAIR GREATER THAN 50% OF OUTER SLEEVE PEGS THAT FAIL VISUALINSPECTIONS OR FLOWS DURING THE FINAL FLOW PROCESS .·#REPLACE C-SEALS, GASKETS, LOCK RINGS/PLATES.·#ASSEMBLE COMPONENTS.·#FLOW-TEST GAS PASSAGES/ADJUST.·#FLOW-TEST GAS PASSAGES TO IDE NTIFY LEAKS ACROSS PISTON RINGS.·#FLOW-TEST LIQUID PASSAGES/ADJUST (DUAL FUEL ONLY)·#C-SEAL LEAK CHECK ALL COVERS.·#FINAL QUALITY CH ECKS (VISUAL INSPECTION OF GENERAL CONDITION OFPARTS, FINAL BORESCOPE OF INTERNAL PASSAGES)·#PREPARE AND ISSUE FINAL REPORT INCLUDIN G FINAL FLOW MEASUREMENTS.·#REPLACE BOXES WITH NEW (AS NECESSARY)·#PACK IN CONTAINERS AND PREPARE FOR SHIPMENT.NOTE: SUPPLY OF PARTS ADDITIONAL TO CONSUMABLES WILL CHARGE AS EXTRAFOR FURTHER DETAILS, PLEASE CONTACT ASM MYNUDDIN (0503620814) MYNUDDIN.H Qty: 1 1-E-Station Phase-1; Ge Frame 9e Agp 32k Dln Upgraded Gas Turbine Units; Secondary Fuel Nozzle Refurbishment. For Further Details, Please Contact: Ahmed Zakaria (0524781810) [email protected] / Asm Mynuddin (0503620814) mynuddin.hossai [email protected] / Marwan Al Mheiri (0501136322) [email protected] STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601256)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2e3f792b-deb7-40fa-bbff-cbf0971da467.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.