Tenders Are Invited For Engineering (Design, Construction And Authors Supervision) For The Construction Of A Multifunctional Sports Hall Arena Vraca In The Sports Complex Hristo Botev, The City Of Vratsa Under Project No. Bg16ffpr003-2.006-0150-C01 Green Solutions For The Sustainable Development Of Szr
Tenders Are Invited For Engineering (Design, Construction And Authors Supervision) For The Construction Of A Multifunctional Sports Hall Arena Vraca In The Sports Complex Hristo Botev, The City Of Vratsa Under Project No. Bg16ffpr003-2.006-0150-C01 Green Solutions For The Sustainable Development Of Szr
Engineering (Design, Construction And Authors Supervision) For The Construction Of A Multifunctional Sports Hall Arena Vraca In The Sports Complex Hristo Botev, The City Of Vratsa Under Project No. Bg16ffpr003-2.006-0150-C01 Green Solutions For The Sustainable Development Of Szr. The Contractor Should Prepare A Complete Project According To The Task Of The Contracting Authority For Issuing A Construction Permit, And The Project Should Include The Possibility Of Staged Implementation Of The Site (Separation Into Two Stages), And Each Stage Should Be Put Into Operation Independently, As Follows: Stage No. 1 - Training Hall Without Spectators During The Development Of This Stage, It Is Necessary For The Contractor To Comply With The Financial Framework Determined For The Implementation And To Foresee The Necessary Activities For Its Implementation And Commissioning. The Main Positions In The First Stage Are: Construction Of The Hall; Delivery And Installation Of The Flooring For Basketball And Volleyball, And Subsequent Certification For Official Matches; Supplying The Building With Electricity, Water And Sewer; Provision Of Lighting For The Training Process; Provision Of Ventilation And Inflow Of Fresh Air For The Trainees - 30 People /Competitors And Coaches/; Changing Rooms For Athletes And Coaches; Warehouses And Technical Premises; Elements For Acoustics; Energy Efficiency; Fire Safety; Substation; The Contractor Can Also Carry Out Other Additional Activities In Accordance With The Approved Project For The Multifunctional Sports Hall - Arena Vratsa With A View To Preparing For The Implementation Of Stage 2 All Activities Under Stage 1 Should Be Provided For In The Approved Project. Each Stage Is Subject To Independent Acceptance And Commissioning. Stage No. 2 - Multifunctional Sports Hall - Arena Vratsa This Stage Follows The Approved Financial Framework For Implementation And Is A Continuation Of The Activities Carried Out In Stage #1. The Main Activities In The Second Stage Are: Delivery And Installation Of Seats And Telescopic Stands; Hall Lighting With Parameters For Tv Broadcasts; Creation Of Common Spaces, Vip Area, Area For Journalists And Tv Studio; Access Control; Heating, Ventilation And Air Conditioning Of The Hall; Sanitary Facilities For Spectators; Technical Premises And Warehouses; Lnp Access Measures; Architectural And Electroacoustics; Fire Safety Measures And Evacuation Routes; Finished Architectural Appearance Of The Building; All Halls, Shops, Etc. Provided In The Project. The Implementation Of Stage No. 2 Should Enable The Contracting Authority To Certify The Hall For Domestic And International Competitions In The Sports Included In The Design Assignment.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.