1 The Subject Of The Order Is The Reconstruction Of The Gas Boiler Room In The Building Of The Jedlicze Commune Office In Jedlicze, Ul. Market Square 5.2 The Subject Of The Order Is The Reconstruction Of The Existing Gas Boiler Room On The Ground Floor In The Building Of The Jedlicze Commune Office, Ul. Rynek 6. The Rebuilt Gas Boiler Room Will Be Used To Power: 1) The Central Heating Installation. Radiator In The Office Building2) Preparation Of Hot Utility Water To Supply Sanitary Utensils. Currently, In The Gas Boiler Room There Is A Cast Iron Gas Boiler With An Atmospheric Burner From Ferroli With A Capacity Of 100 Kw. Due To Wear And Tear, The Existing Cast Iron Boiler Will Be Dismantled And Replaced With A Cascade Of Two Condensing Gas Boilers With Closed Combustion Chambers. The Basic Operation Of The Gas Boiler Room Will Be Carried Out For The Maximum Parameters Of The Heating Medium 90/70 0C. The Scope Of Work Includes In Particular: 1) Boiler Room Technology: A) Dismantling Of Existing Devices. B) Installation Of New Devices, Including Condensing Boilers, Water Heaters And Accessories. C) Installation Of Pipelines. D) Carrying Out Tests And Commissioning. E) Carrying Out Construction And Renovation Works Within The Boiler Room. Gas Installation.3) Partial Reconstruction Of The Water Supply System.4) Partial Reconstruction Of The Central Heating Installation.5) Reconstruction Of The Electrical Installation For The Operation Of The Boiler Room. Note 1 The Scope Of The Order Does Not Include The Dismantling Of Solar Panels Located On The Roof Of The Building And The Installation Of The Photovoltaic Installation Described In The Technical Design Of The Electrical Industry. Note 2 During The Period Of Installation Works In The Remaining Rooms Of The Ground Floor Of The Commune Office Building In Jedlicze, Renovation And Construction Works Will Also Be Carried Out By Another Contractor Under A Separate Contract. The Contractor Will Be Obliged To Organize And Carry Out The Works In A Coordinated Manner With The Entity Carrying Out The Renovation And Construction Works In Question, In Particular In Terms Of The Work Schedule, Access To The Premises And Ensuring The Continuity And Safety Of The Works.3 The Investment Should Be Carried Out Based On: 1) Construction Design And Technical Designs, 2) Technical Specifications For The Execution And Acceptance Of Construction Works, 3) Bills Of Quantities Of Works; 4) Applicable Provisions Of The Construction Law And Technical Standards.4 A Detailed Description Of The Subject Of The Order Can Be Found Included In The Design Documentation And The Technical Specification For The Execution And Acceptance Of Works, Annex No. 6 To The Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.