GTR 113788823
Tenders Are Invited For Road Construction Works – Design And Execution Of Connectivity Road Between A8 And Dn 28 (Podu Iloaiei Bypass), Iaşi County
ICB — International Competitive Bid
Closes Jul 10, 2026
— 1 days left
Eastern Europe
Tender Information
GTR Reference
113788823
Tendering Authority
Subscribe to view
Tender No
361127-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Road Construction Works – Design And Execution Of Connectivity Road Between A8 And Dn 28 (Podu Iloaiei Bypass), Iaşi County
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union
Last Date of Bid Submission
10-07-2026
1 days left
Work Detail
Road Construction Works – Design And Execution Of Connectivity Road Between A8 And Dn 28 (Podu Iloaiei Bypass), Iaşi County. The Object Of The Procurement Consists In The Design And Execution Of The Connectivity Road Between A8 And Dn 28 (Podu Iloaiei Bypass), With A Length Of 4,377 M. The Project Responds To The Pressing Need To Divert Transit Traffic From Dn 28, Which Currently Crosses The City Center, Thus Reducing Traffic Jams And Pollution. Nature Of Services And Works: The Contract Includes The Development Of The Technical Project + De (Pte), The Documentation For The Authorization Of The Works (Dtac) And Technical Assistance. The Road Works Envisage A 9.00 M Wide Road Platform (Corresponding To Technical Class Iii), Consisting Of A 7.00 M Carriageway (Two 3.50 M Lanes) And Two Reinforced Shoulders Of 0.50 M Each. The Route Is Designed For A Speed Of 90 Km/H And Includes The Construction Of Two Roundabouts, Road Junctions, The Arrangement Of Intersections With Roads County And Communal (Dj 282D, Dc 89), As Well As The Construction Of A Bridge Over The Bahlui River. Specific Requirements: Earthworks, Rainwater Collection Systems (Gutters, Ditches), Installation Of Safety Elements (Parapets, Signage) And Relocation Of Affected Accesses Are Required. The Investment Must Ensure A Functional And Independent Connection Between Dn 28 And The Future A8 Motorway, Respecting Road Safety And Environmental Protection Rules. The Budget Lines Of The Project, Approved In The Cte Are Composed Of: 1.2 Development Of The Land 94,290.00 Lei Without Vat 1.3 Arrangements For Environmental Protection And Bringing The Land To Its Original State 5,082,000.00 Lei Without Vat 1.4 Expenditures For The Relocation/Protection Of Utilities 7,000,000.00 Lei Without Vat 2.1 Electric Energy 250,000.00 Lei Without Vat 3.5.4 Technical Documentation Necessary To Obtain Approvals/Agreements/Authorizations 370,972.89 Lei Without Vat 3.5.5 Technical Quality Check Of The Technical Design And Execution Details 35,100.47 Lei Without Vat 3.5.6 Technical Design And Execution Details 1,531,192.09 Lei Without Vat 3.8 Technical Assistance 581,852.99 Lei Without Vat 4.1 Construction And Installations 61,247,683.59 Lei Without Vat 5.1 Site Organization 612,476.84 Lei Without Vat 7.1 Expenses Related To The 25% Budget Margin: 19,804,667.51 Lei Without Vat
Key Value
Tender Value
96,610,236 - RON
Tender Documents
Global Tender Document
a5c13478-bbc0-437f-8e44-7ca8bdc45d6a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.