Installation And Maintenance Of Trial Bicycle Lane . Install A Temporary Bike Lane On Victoria Road In Sydney Between Grant And Jameson Street As Per Document: - Install Necessary Cbrm Supplied Bike Lane Bollards As Per Specification Provided. - Install All Paint Markings As Per Drawing Provided And Materials And Marking As Per Manual Of Uniform Control Devices For Canada (Mutcdc) - Supply And Install All Signs And Posts As Per Indicated Locations. Please Collaborate With Cbrm Public Works To Verify Locates. - All Traffic Signs Are To Be Installed As Per Nspw And Tac Specifications. - Signs To Be Installed On Telspar Posts. - Contractor Is Responsible For All Traffic Control As Per Nova Scotia Temporary Workplace Traffic Control Manual. - Contractor Is To Include Removal Of All Bollards And Signage At The End Of The Trial Period And Return Of All Materials To Cbrm Site. - The Trial Period Is Expected To End In November 2026.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.