4.1. The Subject Of The Order Is The Renovation Of Rooms In The Building In Kępki And In The Building Of The Commune Office In Ulana-Majorata In Order To Increase Access To Wide, Comprehensive, Good Quality Social Services Addressed To The Local Community.4.2. The Scope Of The Order Includes In Particular The Performance Of The Following Works:4.2.1. Task No. 1 - Construction Works Under The Project: Support For Seniors In The Form Of Social Services In The Ulan-Majorat Commune Will Be Carried Out On The Ground Floor In Part Of The Building Of The Former Primary School In Kępki. The Works Will Include, Among Others: 1) Dismantling The Door, Making A Prefabricated Lintel, Opening The Opening, Installing A New Double Door, 2) Dismantling The Partition Wall Along With Dismantling The Door And Replenishing The Parquet Floor, 3) Sanding, Filling Gaps, Varnishing The Parquet Floor, Painting The Skirting Boards, Puttying, Painting The Walls And Ceiling.4.2.2. Task No. 2 - Construction Works Under The Project Creation Of A Social Services Center In The Ulan-Majorat Commune Will Be Carried Out: A) On The Ground Floor In Part Of The Building Of The Former Primary School In Kępki. The Works Will Include, Among Others: 1) Replacing Doors And Frames, 2) Sanding, Filling In Gaps, Varnishing Parquet Floors, Painting Skirting Boards, Puttying, Painting Walls And Ceilings, 3) Dismantling Existing Toilets And Washbasins, Dismantling Existing Toilet Cabins, Chipping Tiles And Terracotta, Making New Water And Sewage Pipes, Making A New Screed, Making New Tiles, Terracotta, Installation Of A Toilet And Washbasin For The Disabled With Handrails, Installation Of A Toilet And Washbasins, Doors To Cabins, Electric Fans Activated With The Light; 4) Separating The Scullery Room By Building A Wall, 5) Supplying Utilities, Laying A Tile Apron, Chipping The Floor, Making A Self-Leveling Screed, Laying Terracotta, Filling The Walls, Painting Walls And Ceilings; 6) Making A Serving Window And For Returning Dishes; 7) Construction Of A Ramp For The Disabled. B) On The Ground Floor Of The Commune Office Building In Ulana-Majorat, Where The Following Works Will Be Performed: 1) Installation Of Window Sills, Installation Of Electrical Installations From Existing Rosettes, Puttying, Painting Of Walls And Ceilings, Chipping Of The Floor, Installation Of Thermal Insulation, Distribution Of Underfloor Heating, Laying Out The Control Cable, Installation Of Concrete Screed, Installation Of Insulation For Panels, Arrangement Of Panels With Speech; 2) Re-Building The Opening, Cutting Out The Opening, Installing The Lintel, Installing The Door With The Frame, 3) Cutting Off The Existing Tiles And Terracotta, Dismantling Sanitary Utensils, Demolition Of Walls, Chipping Out Existing Floors, Making New Approaches To Sanitary Utensils, Making Thermal Insulation, Distributing Underfloor Heating, Laying Out The Control Cable, Making A Concrete Screed, Puttying, Painting Walls And Ceilings, Execut