GTR 113757759
Tenders Are Invited For Construction Work – Renovation Of The Road And Sewerage System At Schönenbüel, Steinegg
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
113757759
Tendering Authority
Subscribe to view
Tender No
365921-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work – Renovation Of The Road And Sewerage System At Schönenbüel, Steinegg
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Last Date of Bid Submission
17-06-2026
Closed
Work Detail
Construction Work – Renovation Of The Road And Sewerage System At Schönenbüel, Steinegg. New Main Sewer In Schönenbüel Street And Street Drainage. The New Meteor Water Main Sewer Will Be Connected To The Existing Structure At Ks 3.0212 And The New Dirty Water Pipe At The Ks 3.S.172 Shaft. The New Line Will Then Be Created On The Sidewalk Half Of The Road. As Part Of The Construction Of The Main Sewer, The Street Drainage Will Also Be Rebuilt. Adaptation Of Existing Sewer System To New Main Sewer The Adaptation Of The Existing Side Connections Of The Old Main Sewer Should Be Carried Out After Completion Of The Main Sewer, Depending On The Construction Process And Depth Of The Existing Pipes. Renovation Of The District Road On The District Road, A New Edge Will Be Added Between The Sidewalk And The Road And Two Sidewalk Crossings Will Be Created On The Gass Streets. A New Base And Top Layer Will Then Be Installed In The Sidewalk And Roadway. Ew Appenzell The Ew Appenzell Is Building A New Transformer Station On The 2039 Plot (Not Part Of The Tender). As Part Of This, The Existing Pipe System In The Schönenbüel And Chäsmoos Areas Will Be Expanded. The Work Should Be Carried Out After The Sewer Work Has Been Completed. If Necessary, This Can Also Be Carried Out With A Second Group In Parallel To The Sewerage Work. The Prerequisite For This Is That Traffic Can Be Routed In One Lane Across The Construction Site Area. Swisscom Before The New Main Sewer Can Be Created, The Slab Shaft, Which Is Currently Located In The Sidewalk-Side Half Of The Road, Will Be Moved To The Other Half Of The Road And The Associated Pipe System Will Be Adjusted.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2583be18-06c3-48e2-8d2d-72abae5285b0.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.