GTR 113751663

Prior Information Notice For Construction Work – Ve9409 Ventilation Systems

ICB — International Competitive Bid Closes Jul 30, 2026 Western Europe
Tender Information
GTR Reference
113751663
Tendering Authority
Subscribe to view
Tender No
370627-2026
Financer Name
Self-Funded
Work Title
Prior Information Notice For Construction Work – Ve9409 Ventilation Systems
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
30-07-2026
Work Detail
Prior Information Notice For Construction Work – Ve9409 Ventilation Systems. Fraport Ag Has Built The New Terminal 3 And Put It Into Operation. Individual Areas Still Need To Be Remodeled. These Will Be Separated From The Areas That Have Been Put Into Operation Through Interim Measures For The Construction Work. At Frankfurt Airport, The Baggage Handling System (Gfa) In Terminal 3 Is Being Expanded. The Expansion Is Broken Down Into Measures. Measure M7: Expansion Of The Two Reserved Baggage Claim Circuits In Building 600, Level E01 (Arrival Baggage Claim Hall), Including The Expansion Of The Two Reserved Drop-Off Points For Arrival Baggage As Well As The Two Transport Lines For Arrival Baggage (Connecting Routes E01-Eu1 Between The Arrival Baggage Drop-Off Points In Building 601, Level E01, And The Baggage Claim Routes In Building 600, Level E01). The Subject Of This Tender Is Services For Ve9409 Refrigeration / Ventilation Systems (M7) With, Among Others, The Following Service Areas: It Is Expected That 12 Displacement Air Outlets In This Area Will Be Dismantled. As With The Existing System, The New Supply Air Comes Through The Base Of The Additional Baggage Claim Belt. The Ductwork In The Basement Eu1 And Ground Floor E01 As Well As New Outlets Are Being Installed. In Addition, Two Circulating Air Cooling Units Are Expected To Be Installed In Each Baggage Claim Carousel. In The Basement 600 Eu1, Another 4 Circulating Air Cooling Units Are Expected To Be Mounted On A Wall. For The Circulating Air Cooling Units, Provided Cooling Connections Are Used Or Enlarged/Extended. In A Technical Hall In 601 E01, 2 Additional Feed Conveyors Are Expected To Be Built By A Third Party, For Which 4 Passive Cooling Convectors Will Probably Be Installed Above Each Feed Conveyor. Delivery And Operational Assembly Of The New Systems, Including Commissioning And Handover To The Company. Start Of Service: 2Nd Quarter Of 2027 Start Of Assembly/Execution: 2Nd Quarter Of 2027 End Of Service: 3Rd Quarter Of 2027
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
0b01959b-6617-4b9b-a194-bd38fbf24fd2.html
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders