Airport Equipment – Replacement Of Anti-Return Security Corridors And Associated Maintenance For Marseille Provence Airport. The Airport Has 13 Anti-Return Security Corridors At The Zcp / Zcv Border Of Each Disembarkation Circuit. 11 Of These Corridors Installed Between 2007 And 2011 Are Now Obsolete. The Project Involves The Replacement Of 10 Corridors Between 2026 And 2027 For Terminals 1 And 2 As Well As The Addition Of A Corridor To Terminal 2. The Non-Return Corridors Will Also Be Equipped With The Emergency Exit Function, At Least For Terminal 2 Because The Other Corridors Already Have An Adjacent Swing Door Which Fulfills This Function. It Should Be Noted That Companies Which Do Not Have The Co48 Pv Will Have To Offer An Alternative Solution “Creation Of An Emergency Exit At Terminal 2”. Farm Unit - Removal, Supply, Installation, Connection And Commissioning Of Anti-Return Corridors The Services Include The Supply, Delivery, Removal Of Existing Corridors, Installation, Connection And Commissioning Of Anti-Return Corridors Terminals 1 And 2 The Anti-Return Corridors Will Be Made Up Of Two Doors As Well As A Gate Placed After The Exit Door And Will Serve As A Safety Boundary And Emergency Exits Or Allow The Installation Of An Emergency Exit Nearby. The Removal Of Existing Corridors And Their Evacuation Are Included. Corridor Passage Width: 900 Millimeters Order Commitment Of 5 Cara: 2 Sas Inter Arrivals + 3 Sas T2 Maintenance During The 2-Year Warranty Period Including Preventive And Curative Maintenance Excluding Spare Parts As Well As A Penalty.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.