Tenders are invited for Provision of Rehabilitation Works for Yaqda and Moonagabey Health Facilities 1 Transportation, site setup, including the provision of all necessary tools, equipment, and building supplies, and mobilization and site clearance upon arrival LS 1 $- 2 Construct a wooden partition wall between the existing rooms of 2m height, by using high quality plywood and woods that are suitable to hold the partition in position. M2 40 $- 3 Lay down 200mm hardcore and construct a plain concrete floor of 100mm with a cement-sand ratio morter of 1:4, lay a smooth finishing lean screed concrete of 50mm. For the entite rooms M3 18.66 $- 4 Provid and apply to all internal and external wall of the CGI sheets of the entire facility with white Emulsion paint M2 159.6 $- 5 Rehabilitation of the Pharmacy: Removal of existing pharmacy shelf and installation of a new one, Installation of Ceilling and electric fan for the pharmacy LS 1 $- 6 Installation of electrical Fans for the rooms 1 for each room Pcs 6 $- 7 Construction water prevention bench to the bottom side the externatl CGI sheet wall by using concrete blocks to prevent water leakage to the rooms (0.3mx0.4mx37m) M3 4.44 $- 8 Renovation of the CGI gate and front side boundary wall which is made of CGI sheets, make sure the existing locally avialilbe polls to hold in position. The existing boundary wall length is about 10m long LS 1 $- 9 Supply 8mm galvanized steel wire mesh, the mesh will be (2m height and 20.7m in length ) M2 41.4 $- 10 Provide and Fix a 4 mm thick plywood Ceiling Boards in the building, this includes brandering using 50mm by 50mm cypress timber and any other required materials, as per Approved by CISP Consultant Engineer M2 124.4 $- 11 Provide and Fix a 4 mm thick plywood Boards for two rooms in the building, this includes brandering using 50mm by 50mm cypress timber and any other required materials, as per Approved by CISP Consultant Engineer M2 72 $- Sub-total $- CONSTRUCTION OF A HALL (14m x 8m) - YAAQDA MCH # DESCRIPTIONS UNIT QUANTITY RATE (USD) AMOUNT (USD) 1 Mobilization and site clearance upon arrival, site establishment including the provision of all required tools, equipment, construction material LS 1 $- 2 Earthwork in excavation of trenches for foundation wall M3 2.64 $- 3 Backfill selected excavated material material and compacted in layers M3 2.64 $- 4 Construct RCC column 350kg/m3 with main bars of 12mm dia and stirrups of 6mm dia at 200mm c/c mix ratio of 1:2:4 of cement/sand/gravel. Including curing, Whitewashing , plastering, and painting Pc 1.65 $- 5 Stone wall in foundation, 40cm thickness bedded and jointed with cement sand mortar of 1:4 proportion (1 cement: 4 clean coarse sand) up to a height of 30cm above the Grade to prepare good quality foundation supporting the structure from external collabse. M3 5.28 $- 6 Hollow concrete block wall 1.2m height, jointed with cement sand mortar of 1:4proportion (1 cement: 4 clean coarse sand) (17.4m x 1.2m) M2 52.8 $- 7 Internal and Externatl walls plastering 20mm thick mortar ratio 1:4 and Whitewashing M2 105.6 $- 8 Provide and apply to all internal and External walls with two coats of stucco filler and two coats of Emulsion white Paint M2 105.6 $- 9 Construct a gauge #30 pox profile sheet blue in colour for roofing using 2x3" timber framework gable trusses of 1000mm C/C and 800mm fully recessed purlines with the Guidance of the CISP Consultant Engineer M2 224 $- 11 Lay 200mm hardcore and construct a plain concrete floor of 100mm with a cement-sand ratio morter of 1:4, lay a smooth finishing lean screed concrete of 50mm. M3 16.8 $- 12 Supply and install single CGI 2x3 timber framed door measuring 1000mm and 2000mm with ladges and hinges Pc 1 $- 13 Provide and Fix a 4 mm thick plywood Ceiling Boards in the building, this includes brandering using 50mm by 50mm cypress timber and any other required materials, as per Approved by CISP Consultant Engineer M2 112 $- 14 Construction of seat Bench(Dabadaalis) for the patients and waiters (32mm wide with back seat on steel metal supportive provision, the length should be 44m long and 0.4m high setting level and 0.5m high back support with 0.3m timber rest at the back fixed on the metal column polls M3 5.28 $- 15 Provide and Install rain gutterers all around with down pipe M 44 $- 16 Electrical installation of the entire hall, including sockets, two 20W light bulb and 2 electric fans LS 1 $- 17 Visibility logo on the brick wall using sadolin weatherguard or crown permacote Ultra Paint LS 1 $- Sub-total $- CONSTRUCTION OF A HALL (7.4m x 5m) - MOROGABAY MCH # DESCRIPTIONS UNIT QUANTITY RATE (USD) AMOUNT (USD) 1 Mobilization and site clearance upon arrival, site establishment including the provision of all required tools, equipment, construction material and demolosion of the existing structures LS 1 $- 2 Earthwork in excavation of trenches for foundation wall M3 2.61 $- 3 Backfill selected excavated material material and compacted in layers M3 2.61 $- 4 Construct RCC column 350kg/m3 with main bars of 12mm dia and stirrups of 6mm dia at 200mm c/c mix ratio of 1:2:4 of cement/sand/gravel. Including plastering, curing and painting Pc 1.25 $- 5 Stone wall in foundation, 40cm thickness bedded and jointed with cement sand mortar of 1:4 proportion (1 cement: 4 clean coarse sand) up to a height of 30cm above the Grade to prepare good quality foundation supporting the structure from external collabse. M3 4.176 $- 6 Hollow concrete block wall 1.2m height, jointed with cement sand mortar of 1:4proportion (1 cement: 4 clean coarse sand) (17.4m x 1.2m) M2 20.88 $- 7 Internal and Externatl walls plastering 20mm thick mortar ratio 1:4 M2 63.76 $- 8 Provide and apply to all internal and External walls with two coats of stucco filler and two coats of Emulsion white Paint M2 63.76 $- 9 Construct a gauge #30 pox profile sheet blue in colour for roofing using 2x3" timber framework gable trusses of 1000mm C/C and 800mm fully recessed purlines with the Guidance of the CISP Consultant Engineer M2 74 $- 10 Construct wooden partition wall inside the hall of 1.3m heaigh, by using high quality plywood and woods that are suitable to hold the partition in position. M2 10.4 $- 11 Lay 200mm hardcore and construct a plain concrete floor of 100mm with a cement-sand ratio morter of 1:4, lay a smooth finishing lean screed concrete of 50mm. M3 5.55 $- 12 Supply and install single CGI 2x3 timber framed door measuring 1000mm and 2000mm with ladges and hinges Pc 1 $- 13 Provide and Fix a 4 mm thick plywood Ceiling Boards in the building, this includes brandering using 50mm by 50mm cypress timber and any other required materials, as per Approved by CISP Consultant Engineer M2 37 $- 14 Construction of seat (Dabadaalis) for the patients and waiters (32mm wide with back seat on steel metal supportive provision, the length should be 10m long and 0.5m high setting level and 0.5m high back support with 0.3m timber rest at the back fixed on the metal column polls M3 1.5 $- 15 Provide and Install rain gutterers all around with down pipe M 20 $- 16 Electrical installation of the entire hall, including sockets, two 15W light bulb and 2 electric fans LS 1 $- 17 Visibility logo on the brick wall using sadolin weatherguard or crown permacote Ultra Paint LS 1 $- Total $- BOQ Summary 1 Rehabilitation and Construction of Yaaqda MCH $- 2 Construction of a Hall in Morogabay MCH $- Tender Link : https://somalijobs.com/tenders