1. The Subject Of The Order Is: Performance Of Construction Works On The Task Titled Modernization Of Hygienic And Sanitary Rooms In The Building Of The School Complex In Poniatowa. Investment Address: Ul. Fabryczna 16 C, 24 – 320 Poniatowa.2. The Scope Of The Order Includes In Particular Construction Works Consisting In The Modernization Of Hygienic And Sanitary Rooms And Installations In The School Complex In Poniatowa In The Scope Of Part Of The Building Covered By The Documentation. The Scope Of The Order Includes Construction Works Inside And Outside The Building.1. Construction Works Include In Particular: A. Construction Of Brick Walls, B. Construction Of Walls Using The Dry Construction System, C. Widening Door Openingsd. Execution Of Floors, E. Installation Of Suspended Ceilings, F. Facing Walls With Tiles, G. Installation Of Door Joinery. Installation Of New Internal Window Sills, I. Supplementing The Roof Covering, J. Plastering, K. Painting.2. Demolition Works Include In Particular: A. Dismantling The Walls, B. Dismantling The Floors, C. Dismantling Wall Coverings Made Of Tiles, D. Plaster Cutting, E. Dismantling Suspended Ceilings, F. Dismantling Sanitary Installations With Fittings, G. Carving Door Frames Out Of The Wall, H. Dismantling The Chimney, I. Disassembly Of Internal Window Sills. 3. Sanitary Works Include In Particular: A. Execution Of Internal Water Installations, Sanitary Sewage, Hydrant, Ventilation, B. Purchase And Installation Of Sanitary Utensils And Fittings, C. Tightness Tests.4. Electrical Works Include In Particular: A. Execution Of Internal Electrical Installation, B. Installation Of Switches, Plug Sockets, General Lighting, C. Taking Measurements.5. For This Procedure, The Ordering Party Provides Broader Documentation. The Scope Of Works For The Tender Is As Follows: A. Disassembly And Demolition Works As Well As General Construction Works In The Bathroom Section In The Main Part Of The Building, B. Water Installation Works (Cold And Hot Water, Circulation) In The Bathroom Section In The Main Part Of The Building, C. Sanitary Sewage Installation Works In The Main Part Of The Building, D. Works Including Replacement Of Installations (Water And Sewage) In The Nurses Room On The First Floor, Without Replacing Sanitary Equipment (Washbasin And Sink), E. Hydrant Installation Works In The Main Part Of The Building, F. Ventilation Installation Works In The Bathroom Section In The Main Part Of The Building, G. Disassembly And Demolition Works And Reconstruction Of The Floor During The Installation Of An Under-Floor Sanitary Sewage System In The Main Part Of The Building. Installation Of Water And Sanitary Sewage Systems In The Accounting Room (Works Related To Bathrooms In The Main Part Of The Building), I. Electrical Installation Works In The Bathroom Section In The Main Part Of The Building, Ii. Works On The Roof Within The Above-Mentioned Rooms In Connection With Works Carried Out Inside. 6. The Bathroom Section In
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.