The Scope Of The Order Includes: 1) Insulating The External Walls Of The Basement Of The Building Below The Ground Level To The Foundation Depth With Styrodur With A Maximum Lambda Coefficient = 0.038 [W/Mk] With Drying The Walls And Installing Waterproofing And Fenders, 2) Insulating The Ceiling Above The Unheated Basements Of The School Building With A Layer Of Polyurethane Foam Boards With A Maximum Lambda Coefficient = 0.023 [W/Mk] And Thickness Of At Least 10 Cm From The Bottom Of The Ceiling, 3) Insulating The Ceiling Under The Unheated Attic Of The Segment Of The Old Part Of The School With Mineral Wool With A Maximum Lambda Coefficient = 0.036 [W/Mk] And A Thickness Of At Least 15 Cm With The Construction Of Communication Platforms, 4) Insulating The Flat Roof Of The Gymnasium Building With Polyurethane Foam With A Maximum Lambda Coefficient = 0.023 [W/Mk] And A Minimum Thickness Of 15 Cm With A Suspended Ceiling, 5) Replacement Of 12 External Doors, Which Have An Average Weighted Heat Transfer Coefficient Of The Partition At The Level Of U = 2.60 [W/Mk] With Doors With The Maximum Required According To Wt2021. Heat Transfer Coefficient Umax = 1.30 [W/M2k], Including Maintaining The Current Form Of The Doors Of The Historic Part Of The Building6) Replacement Of 2 Uninsulated Internal Doors In A Satisfactory Condition, Separating The Heated Volume Of The School Building From The Unheated Basement And Unheated Attic, Which Have A Heat Transfer Coefficient Of The Partition At The Level Of U = 3.60 [W/M2k] With Doors With The Maximum Coefficient Required According To Wt2021 Heat Transfer U.Max = 1.30 [W/M2k], 7) Adjustment Of External Pvc Windows From 2007-2014 With Possible Replacement Of Fittings And Seals, Installation Of Manually Controlled Air Vents In Basement Rooms And Hygro-Controlled Air Vents In Sanitary And Toilet Rooms, 8) Modernization Of The Electrical Lighting Installation With Replacement Of Existing Fixtures And Light Sources, Pcs. 341 With Fixtures Energy-Saving Leds, 432 Pcs., Together With The Power Supply Installation And Protection Devices, Allowing For The Correct And Safe Operation Of The Replacement Installation, Checking The Lighting In Accordance With The Guidelines For School Rooms In Force On The Day Of Implementation;9) Central Heating Installation By Replacing Radiators, Replacing Cables, Installing Anti-Manipulation Thermostatic Valves, Installing Sub-Vertical Valves, Installing Automatic Air Vents, Replacing Circulation Pumps, Installing Plasterboard Elements Along With Revisions.10) As Part Of The Accompanying Works, Infrastructure Tasks Related To The Accessibility Of Disabled People Will Be Carried Out - Ensuring The Standard For The Entire Facility Subject To Energy Modernization And Carrying Out Repair And Reconstruction Works In Connection With The Modernization Works, Sample Measurements And Checks For All Industries. Accessibility Should Take Into Account The General Spectrum, I.E. Also Disability 2. T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.