GTR 113565281
Bids Are Invited For F695-00Noi Ubch Koerner Hvac Controllers
ICB — International Competitive Bid
Closed
Northern America
Tender Information
GTR Reference
113565281
Tendering Authority
Subscribe to view
Tender No
229793
Financer Name
Self-Funded
Work Title
Bids Are Invited For F695-00Noi Ubch Koerner Hvac Controllers
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,G20,APAC (Asia Pacific)
Last Date of Bid Submission
02-06-2026
Closed
Work Detail
F695-00Noi Ubch Koerner Hvac Controllers . Vancouver Coastal Health (Vch) Intends To Proceed With The Koerner Hvac Controllersproject, Located At The Koerner Pavilion On The Ubc Hospital (Ubch) Campus,Project Numberf695-00. The Contractor And The Estimated Value Of The Work Will Be: Honeywell Limited. At 300-3490 Gardner Court, Burnaby, Bc V5g 3K4 Estimated Around $2,100,000.00 Plus Gst Estimated Completion: December 2027 The Scope Of Work Includes The Upgrade Of Direct Digital Control (Ddc) Systems, Replacement Of Associated Sensors And Input Devices, And The Replacement Of Pneumatic Actuators With Electrical Actuators For The Hot And Cold Deck Fan Systems Serving The Air Handling Units At The Koerner Pavilion, Ubc Hospital. Vch Has Chosen To Direct Award The Contract For The Following Reasons: Technical Compatibility The Existing Building Management System (Bms) At Ubc Hospital Is Based On The Proprietary Honeywell Platform, Where Integrated Honeywell Software, Licensed Applications, Controller Firmware, And Compatible Hardware Operate Together As A Single System. A Vendor Other Than Honeywell Would Require Extensive Modification Or Replacement Of The Current Software, Licenses, And Potentially Hardware In Order To Achieve Interoperability. Cost Considerations Proceeding With A Honeywell Solution Allows The Utilization Of The Existing Flatform And Infrastructure. Switching To A Non-Honeywell Control System Would Require Significant Additional Investments In New Bms Software, Licenses, Engineering Reprogramming, And Staff Retraining. Schedule And Risk Mitigation Honeywell’S Familiarity With The Existing System Allows For A Streamlined Design, Installation, And Commissioning Process, Reducing The Project Timeline. Other Vendors Would Require Additional Effort And Time To Reverse-Engineer Existing Sequences And Integrate With Incompatible Systems. Service Agreement Alignment Ubc Hospital Holds An Active Service Contract With Honeywell Covering The Bms, Controls, And Related Equipment Services And Maintenance. Adding A Different Vendor’S System Would Create Service Gaps And Complicate Future Maintenance And Support Responsibilities. Contractorsmay Challenge This Decision By Sending An Email Tothe Undersignedby June 2, 2026, At 15:00 Local Time. Provide Proof Showing Your Equivalent Healthcare Project Experiences, Ability To Meet The Requirements And Project Timeline Stated In This Notice Of Intent.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
4f990bb1-a691-4d0e-a086-acc4326e09c0.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.