The City Of Rauma Is Requesting A Bid For The Earthworks Of Phase 1 Of The New Football Stadium Of The Rauma Äijänsuo Sports Center In Accordance With This Request For Bids And Its Attached Documents. The Scope Of The Contract Is The Earthworks Of Phase 1 Of The New Äijänsuo Football Stadium, Subcontract 1, And The Removal Of The Existing Football Stadiums Artificial Turf (Option). Subcontract 1 Is Included In Phase 1 Of The Football Stadium, Where The Existing Natural Grass Football Field Will Be Converted Into An Artificial Grass Field. In The First Phase (Subcontract 1), The Contractor Will Focus On Excavation And Earthworks, As Well As Related Lvias Works And, As An Option, The Removal Of The Old Fields Coating And Heating Pipes. As An Option, The Removal Of The Coating Of The Existing Football Stadium Includes The Removal Of The Artificial Turf, The Rubber Crumb And The Molded Elastic Rubber Layer, As Well As The Emptying And Removal Of The Heating Pipes On The Field And The Filling/Leveling Of The Pipe Trenches. Phase 1 Of The Construction Project Is Divided Into Two Subcontracts. Subcontract 1 Includes The Works In Accordance With All The Request For Tender And Plan Documents, E.G.: - Earthworks - Excavation Works (Reservations For Stands And Other Facilities) - Fence Above The Rock Cut - Construction Of Structural Layers Up To The Upper Leveling Layer (30Mm) (See Work Description Section 21000 Parts Of The Superstructure) - Lighting Masts With Foundations And Cables - In Accordance With The Plans Plumbing Works - Installation Of The Supply Water Line And District Heating Lines Coming Under The Jkpp Next To The Winter Training Hall (The District Heating Is Plugged Next To The Future Heating Container) - The Winter Training Hall And Parking Area Water Line And Sewer Line Changes With Trenches, Pipes, All Materials And Installations Are Also Part Of The Contract. According To The Attached Design Documents, Colored Pipes. In Drawing 25021014 R2.3, The Following Is Mentioned: The Discharge End Of The Storm Water Pipe 315Peh Must Be Lowered In The Existing Well To The Level +8.50 (Now 8.87) So That It Does Not Collide With The Waste Water Pipe. This Must Be Taken Into Account During The Installation Phase Of The Drains. - Construction Site Services - Irrigation System Piping (Option) - After The New Artificial Grass Field Is Put Into Use, The Removal And Disposal Of The Artificial Grass Of The Existing Soccer Stadium And The Rubber Spring Cast In Place Below It In An Appropriate Manner, As Well As The Emptying And Dismantling Of The Heating Circuit Under The Existing Artificial Grass, As Well As Leveling The Surface. (Option) Earthworks Subcontract 1 Includes The Completion Of The Whole According To The Documents. The Contract Form Is A Total Contract. The Selected Overall Contractor Acts As The Main Contractor And As The Main Implementer, As Defined By The Legislation, With Regard To The Overall Contract. The Condition For Submitting An Offer Is To Attend The Target Screening Organized By The Customer Either On Friday 29 May 2026 From 9:00 To 11:00 Or On Monday 1 June 2026 From 9:00 To 11:00. Registration
[email protected]. Screenings Are Only Organized If You Have Registered For The Event. Osauraka 1S Work Is To Be Completed For The New Field By March 31, 2027, And The Demolition Of The Old Artificial Turf Must Be Completed By May 31, 2027. The Procurement Unit Adds The Tender Request As An Attachment Document During Week 22 Of The Contract Program.