GTR 113468861

Bids Are Invited For Kikomun Creek Provinical Park – Surveyors Lake Bridge Replacement

ICB — International Competitive Bid Closed Northern America
Tender Information
GTR Reference
113468861
Tendering Authority
Subscribe to view
Tender No
ENV27-BCPKO-16
Financer Name
Self-Funded
Work Title
Bids Are Invited For Kikomun Creek Provinical Park – Surveyors Lake Bridge Replacement
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,G20,APAC (Asia Pacific)
Last Date of Bid Submission
23-06-2026 Closed
Work Detail
This Tender Includes The Detailed Design And Scope Of Work To Replace The Existing Pedestrian Bridge Atthe Kikomun Creek Provincial Park. In General, The Work Consists Of The Following:.1 The Work Of This Contract Consists Of The Supply And Installation Of Materials, Includingall Labour, Equipment And Tools Related To The Surveyors Lake Bridge Replacement, Allin Accordance With The Drawings And Specifications, And For The Prices Tendered In Theschedule Of Quantities And Unit Price Table..2 The Components Of The Work Are Generally Described As Follows:A. Supply And Install Two (2) Cast-In-Place Concrete Abutments Complete With Steelreinforcement, Frost Cushion And Three (3) Screw Piles Per Each Abutment Withminimal Ground Disturbance Under Original Abutment Footprint.B. Design, Supply And Install 18.0 M Clear-Span, Pre-Engineered Prefabricatedaluminum Bridge Complete With Sliding Bearings, Bearing Plates, Anchor Bolts,Transition Cover Plates As Designed By The Bridge Fabricator, Aluminum Dripthroughdecking, And Railings As Shown On The Contract Drawings. Shop Drawingsshall Be Prepared, Sealed, And Signed By A Structural Engineer Registered Withegbc And Submitted To Isl Engineering For Review And Approval Prior Tofabrication.C. Remove And Dispose Of Existing Wooden Bridge And All Related Components.D. The Work Site Is Primarily Accessible By Helicopter, With The Staging Area Locatedat The Upper Parking Lot Of Saunders Day Use Area. Removal Of The Existingbridge Span And Installation Of The New Bridge Span, As Well As Transport Of Allmajor Materials And Equipment, Will Be Conducted By Helicopter. Personnel Andlimited Small Equipment May Access The Site Via An Existing 1.0 M Widemachine‑Built Access Trail. Any Impacted Trails Shall Be Reclaimed Onceconstruction Has Been Completed Complete.The Lowest Or Any Tender Will Not Necessarily Be Accepted.Schedule:• Commence The Work: On Or Before The 5Th Day Of October 2026.• Substantial Performance: On Or Before The 23Rd Day Of November 2026.• Total Performance: On Or Before The 2Nd Day Of December 2026.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
31a09be3-252d-4770-ba71-2538c510ecc3.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders