1. The Subject Of The Order Is The Reconstruction Of The District Road No. 1015C Tuchola-Tleń From Km 0+000 To Km 21+733 In The Town Of Trzebciny From Km 19+750 To Km 21+733.2. The Scope Of Works Includes In Particular (The Scope Of This Order Covers The Road, Sanitary And Electrical Sectors): 1) Reconstruction Of The Road Route, 2) Cutting Of Greenery And Replacement Plantings, 3) Demolition Works, 4) Earthworks, 5) Protection Of Power Cables, 6) Construction Of The Substructure, 7) Reconstruction Of The Road Surface, 8) Reconstruction Of Exits, 9) Construction Of A Pedestrian Road, 10) Road Safety Elements, 11) Reconstruction Of The Electrical Network And Construction Of Lighting, 12) Storm Sewage System.3. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation Approved By The Decision To Authorize The Implementation Of The Road Investment Constituting Annex No. 8 To The Swz, The Bill Of Quantities Constituting Annex No. 10 To The Swz, As Well As In The Technical Specifications For The Execution And Acceptance Of Construction Works, Constituting Annex No. 9 To The Swz.4. The Contractor, Without Additional Remuneration, Undertakes To: 1) Perform All Preparatory Works, Including Cleaning Works, Organization And Maintenance Of The Construction Site, Provide An Energy Connection For The Needs Of The Construction Site And Bear The Costs Of Their Consumption, 2) Mark And Secure The Construction Site, 3) Bear All Costs Of Research, Expert Opinions And Opinions Necessary To Assess The Quality Of The Works And Proper Performance Of The Subject Of The Order, 4) Bear The Costs Related To The Acceptance Of The Completed Works, 5) Prepare A Traffic Management Project For The Duration Of The Works Before Entering The Construction Site,6) In The Event Of Damage To Equipment Or Parts Thereof (Including Water And Sewage Networks, Electricity, Electrical Engineering, Drainage Devices And Municipal Roads) During The Execution Of The Subject Of The Order - Repairing Them And Restoring Them To Their Original Condition,7) Covering The Costs Of Possible Compensation For Entering The Land And Destroying Crops,8) Covering Possible Costs Of Dismantling, Assembling Or Repairing Property Fences And Other Damage To Existing Facilities And Development Elements Area,9) Covering The Costs Of Restoring Road Surfaces,10) Carrying Out Surveys, Tests, Etc., As Well As Making Uncovered Works In The Event Of Failure To Report Works That Are Covered Or Disappearing For Acceptance,11) Ensuring Supervision As Well As Appropriate Occupational Health And Safety Conditions,12) Ensuring And Covering The Costs Of Surveying Services, Including The Preparation Of A Surveying Inventory In 2 Copies, 13) Keeping The Construction Site Free From Traffic Obstacles And Removing Them On An Ongoing Basis Unnecessary Materials, Waste And Garbage, 14) Tidying Up The Construction Site After The Completion Of The Works And Handing It Over To The Ordering Party No Later