The Subject Of The Order Is The Construction Of A Village Community Center Building Along With The Necessary Technical Infrastructure. The Task Will Be To Complete The Construction Of A Community Center, The Construction Of Which Began In 2023. Stage Ii Will Include The Following Works: Sanitary Installations. Sanitary Installations Include: - Mechanical Ventilation Installations, - Freon Installations, - Hot, Cold And Hydrant Installations, - Sanitary Sewage Installations, - White Installation, - Central Heating Installations With A Heat Pump. Installation Electricalthe Scope Of Electrical Installations Includes: - Cabling And Wiring, - Lighting Installations, - Emergency And Evacuation Lighting Installations, - Installations Of Plug Sockets And Socket Sets, - Cctv, Sswin, Call System, Lan Installations - Photovoltaic Installations. Rural Career Building And External Works As Part Of Construction Works And Land Development, The Following Should Be Carried Out: - Demolition Of The Existing Fence And Its Disposal, - Construction Of A New Fence, - Parking Lot (Curbs, Substructures, Paving Stones) - Construction Of Partition Walls, Plasterboard Structures, - Forging Holes In The Walls In Accordance With The Documentation, - Construction Of The Attic Floor, Balustrades, - Roof Insulation, - Floors And Floors (Insulation, Screeds), - Door Joinery, - Internal Plasters, Suspended Ceilings, Gypsum Plasters, Wall And Floor Cladding, Internal Window Sills, Painting Of Walls And Ceilings. Building Equipment The Facilitys Equipment Should Include The Following: - Cloakrooms And Communications (Doormats, Hangers, Health And Safety Cabinets, Etc.), - Sanitary Rooms (Handles, Mirrors, Bathroom Countertops, Containers, Electric Dryers, Baskets, Etc.) - Kitchen And Auxiliary Rooms (Induction Cooker, Pot Washing Basin, Countertops, Table, Shelves, Dishwasher Cabinets, Refrigeration Cabinets, Etc.).