1. Renovation Of The Premises The Scope Of The Study Includes The Construction Design For The Reconstruction Of The Locker Room Complex With A Sports Field In Bardo At Ul. Kolejowa 12 (Plot No. 747/4, District 0005 Bardo, Bardo Commune). The Reconstruction Concerns All Rooms In The Cloakroom Complex After A Natural Disaster, I.E. Flood. The Renovation Includes Cutting And Laying New Plasters And Ceramic Tiles, Cutting And Installing A New Floor, And Installing A New Floor On The Ground In The Fitness Room. Windows And Doors Will Also Be Replaced. Moreover, In Rooms With Ceiling Paneling, It Is Planned To Dismantle It And Build New Suspended Ceilings From Plasterboards, As Well As Refreshing Some Of The Ceilings By Painting. It Is Also Planned To Replace All Washbasin, Shower And Urinal Taps. In All Rooms, It Is Planned To Replace The Radiators And Valves With New Ones, As Well As Some Of The Central Heating System Pipes. In Addition, It Is Planned To Replace All Electrical Sockets And Part Of The Lighting Installation. In Addition, It Is Planned To Refresh The Facade Of The Cloakroom Buildings By Painting And Making A Marmolite Strip. Construction Of A New Roof Over The Entrance To The Building And Replacement Of The Trapezoidal Sheet Metal Roofing Along With Sheet Metal Flashing2. Electrical Installation The Following Are Subject To Development: - Power Supply Of The Facility - Cable Lines Supplying The Designed Facilities, - Area Lighting Installation - Replacement Of The Electrical Installation In The Facility - Protection Against Electric Shock, - Installation Of Equipotential Bonding, - Fire Protection - Surge Protection3. Football Pitch Lighting In Order To Mount The Lighting Masts, Due To The Unfavorable Parameters Of The Ground, Individual Foundations Were Designed In The Form Of Reinforced Concrete Foundation Footings. The Foundation Should Be Made Of C20/25 Class Concrete With A Minimum Water Resistance Coefficient Of W8, Reinforced With Aiii Steel Bars. The Reinforcement Arrangement And Foundation Dimensions Are Shown In The Study Drawings. Make The Foundation On A Lean Concrete Base. After Completing The Foundation, Protect The Elements Located Below The Ground Level With Bituminous Insulation, Laid Twice According To The Insulation Manufacturers Instructions. To Build The Foundation, A Set Of Earthworks Must Be Performed. Six Om1-6 Pole Positions Were Designed To Illuminate The Turf. Each Mast Is 16 M High. Each Mast Is Equipped With 9 Floodlights. Led Light Source Color 4000 K.4. Replacing The Fence. As Part Of The Task, It Is Planned To Replace The Existing Fence. The Existing Fence Must Be Dismantled. Make A New Panel Fence Around The Perimeter Of The Existing Pitch In Accordance With The Drawing. Fence 1.5M5 High. Irrigation Of The Football Pitchirrigation Of The Pitch Is Based On Twenty-Four Sprinklers, Eight Of Which Will Be Located On The Pitch. Sprinklers With A Radius Of 20 M.6. Replacement Of Ball Catchers. Existing Ball Ca
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.