The Scope Of The Subject Of The Order Includes In Particular: 1/ Development And Approval Of A Temporary Traffic Organization Project And Marking Of Works Carried Out In Accordance With This Project, 2/ Development Of Necessary Technological Designs (Including, If Necessary, Obtaining All Permits/Notifications Required By Law To Enable Works Interfering With The River Bed, Etc.), 3/ Organization, Maintenance, Security And Marking Of The Construction Site, 4/ Construction, Maintenance, Security, Marking And Demolition Of Temporary Hardenings / Access Roads Related To The Construction Of The Facility Bridge; 5/ Execution Of Preparatory And Demolition Works, Including Cutting Down Trees, Replanting One Tree, Moving A Section Of The Existing Fence, 6/ Construction Of A Bridge For Pedestrians And Bicycles Over The Swędrnia River, Including The Construction Of A Single-Span Bridge Structure With A Steel Supporting Structure In The Form Of Two Plate Girders With An Orthotropic Slab, Based On Reinforced Concrete Solid-Wall End Supports With Reinforced Concrete Wings Retaining Walls Limiting The Embankment On The Access Roads To The Facility,7/ Construction Of A Stone Riprap Near The Facility And On The Banks Of The River (Including Protection With A Wooden Palisade),8/ Construction Of A Bicycle Path And A Pedestrian Road (Sidewalk) With An Asphalt Concrete Surface,9/ Construction Of Rest Areas For Pedestrians And Cyclists With A Surface Of Concrete Slabs Equipped With Benches, Bicycle Racks And Garbage Bins,10/ Construction Of A Road Technological Structure With A Surface Made Of Openwork Slabs,11/ Construction Of A Street Lighting Network Along The Bicycle Path And Sidewalk And Illumination Of The Bridge Structure,12/ Construction Of An Induction Loop For A Bicycle Traffic Counting Device,13/ Protection Of The Existing Power Grid,14/ Piping Of A Section Of The Existing Roadside Ditch Along With Cleaning Of The Culvert Under The Road Embankment, 15/ Construction Of Vertical And Horizontal Markings,16/ Construction Of Greenery - Planting Trees And Lawns,17/ Surveying Services For The Works In Progress, Including The Preparation Of Current Surveying Reports To Determine The Quantity And Scope Of Works Covered By Partial Acceptance, Together With An As-Built Surveying Inventory (Paper And Electronic Versions - Dwg Format) Taking Into Account Decommissioned Equipment And Changes In Land Use.18/ Obtaining A Permit To Use The Facility,19/ Establishing A Bridge Facility Book,20/ During The Care And Maintenance Period Green Areas Performing Maintenance Works, Among Others Twice A Year From April 15 To September 15.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.