1. The Subject Of The Order Is The Development Of Comprehensive Design Documentation, Obtaining A Notification And Performing Construction And Assembly Works In The Scope Of Modernization Of The Orlik Complex And Installation Of Small Architectural Objects On The Premises Of The Public Primary School In Gorzów Śląski. The Study Also Covers The Implementation Of Electrical Installations To The Extent Necessary For The Functioning Of The Monitoring System. The Subject Of The Order Includes Obtaining The Necessary Decisions, Opinions And Arrangements, As Well As Supervising And Providing Management Of The Works In All Industries. The Investment Will Be Located Entirely On The Plot No. 764/1, 764/2 In Gorzów Śląski, Owned By The Commune. As Part Of The Investment Task, Documentation Should Be Developed Along With The Necessary Arrangements And Permits, As Well As The Execution Of Construction Works, The Aim Of Which Is: A) Modernization Of The Orlik Sports Fields Complex - Replacement Of Ball Catch Nets - Replacement Of Football Goals With Nets - Replacement Of Basketball Nets - Replacement Of Baskets For Garbage - Replacement Of Fixtures With Leds - Replacement Of Small Architectural Objects (Benches, Waste Bins) - Modernization Of The Synthetic Grass Surface (Gluing In One Place) - Installation Of Monitoring - Installation Of A Notice Board B) Modernization Of The Beach Volleyball Court - Replacement Of Sand - Installation Of Nets And Game Posts C) Installation Of Small Architectural Elements - A Fitness Playground With A Synthetic Grass Surface And Small Architectural Elements (Bench, Waste Bin) D) Execution Of Auxiliary Works, Preparatory And Clean-Up Activities As Well As Repairing Any Damage E) Carrying Out Necessary Measurements, Tests And Checks F) Providing, If Necessary, A Construction Manager And Designer Supervision By Persons With Appropriate Construction Qualifications G) Providing Geodetic And Geological Construction Services H) Maintaining Construction Documentation I) Conducting Appropriate Tests And Tests, Developing As-Built Documentation Of As-Built Geodetic Measurements J) Preparing As-Built Documentation Of The Investment 1.1. In The Design Documentation, The Contractor Is Obliged To Agree On The Developed Design Documentation In The Working Mode And Take Into Account The Employers Comments, Guidelines And Instructions. The Ordering Party Requires The Contractor To Organize Coordination Meetings With The Participation Of The Ordering Party And The Contractors Representatives In Order To Discuss Current Matters Regarding The Progress Of The Design Documentation, Proposed Design Solutions Or Problems Occurring At The Design Stage. Coordination Meetings Should Take Place At Least Once A Month. The Dates Of The Coordination Meetings Will Be Set By The Ordering Party In Consultation With The Contractor.1.2. Before Submitting A Notification To The Architectural And Construction Department, The Contractor Is Obliged To Obtain The Emplo
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.