GTR 113311555
Tenders Are Invited For Execution Of An Investment Task In The Design And Build Mode - Rationalization Of Energy Consumption In Public Buildings In The Łęczyca District - Dps In Karsznice
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
113311555
Tendering Authority
Subscribe to view
Tender No
IZ.272.6.2026.PK
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Execution Of An Investment Task In The Design And Build Mode - Rationalization Of Energy Consumption In Public Buildings In The Łęczyca District - Dps In Karsznice
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
01-06-2026
Closed
Work Detail
1. The Subject Of This Order In The Design And Build Formula Is The Comprehensive Design And Construction Of: - A Ground Heat Pump, - An Air-Air Heat Pump, - A Photovoltaic Installation, - A Fire Protection Switch Installation, - Modernization Of The Central Heating And Hot Water System, - Modernization Of The Lighting Installation, - Insulation Of The Ceiling Of The Top Floor Of Two Buildings (A And B), And Other Accompanying Works Necessary For The Implementation Of The Subject Of The Contract. A Detailed Description Of The Subject Of The Order Can Be Found In Annex No. 7 To The Swz, And Is Also Consistent With The Draft Provisions Of The Contract Constituting Annex No. 6 To The Swz. The Ordering Party Informs That The Order Is Co-Financed By Wfośigw In Łódź Under The Priority Program - Rationalization Of Energy Consumption In Public Buildings And Municipal Resources - 2025 Edition. As Part Of The Subject Of The Order, The Contractor: 1.1. Stage I - Prepare Complete Design Documentation Regarding The Scope Of All Works Indicated In Point 1. Obtain An Appropriate Building Permit Or Notification In Accordance With The Provisions Of Construction Law. If The Above-Mentioned Documentation Does Not Require Obtaining A Building Permit Or Submitting A Notification, The Contractor Will Present Information Confirming This Fact, Obtained From The Construction Department. The Documentation Must Be Completed Within The Time Limits Specified In Point. Vi Swz. Complete Design Documentation Must Include: A) Industry-Specific Construction Design Developed In Accordance With The Regulation Of The Minister Of Development Of September 18, 2020 On The Detailed Scope And Form Of The Construction Design, Journal Of Laws From 2020 Pos. 1609, The Principles Of Technical Knowledge And Applicable Standards, I.E.: Architectural And Construction Design: Pcs. 5, Technical Design: Pcs. 5, Bill Of Quantities: Pcs. 1, Investors Cost Estimate: Pcs. 1, Stwiorb: Pcs. 1, Electronic Version Of The Documentation: Pcs. Institutions, Including Required Reports, Expert Opinions, Hydrogeological Documentation, Geotechnical Documentation, Arrangements With A Conservator, Archaeologist, Fire Protection Expert, Etc.; C) Information From The Designer About Safety And Health Protection Requirements. As Part Of This Order, Any Studies That May Be Necessary For The Design, Delivery, Assembly And Use Of The Subject Of The Order Should Be Prepared. All Studies Should Be Prepared In A Number Of Copies Enabling Obtaining All Necessary Arrangements And Permits, Plus Copies For The Ordering Party.1.2. Stage Ii - Perform Construction Works: Installation Of A Ground Heat Pump, Air-Air Heat Pump, Modernization Of The Central Heating System. And Hot Water, Modernization Of The Lighting Installation And Insulation Of The Ceiling Of The Top Floor Of Two Buildings.1.3. Stage Iii - Perform Construction Works Related To The Photovoltaic Installation And Fire Protection Switch.2. The Contractor Is Oblig
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
32faa6de-7389-40d1-91d5-8cd46d285866.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.