Tenders Are Invited For Construction Work – Roofing Plumbing Work Ve307

Tender Detail

113262928
343062-2026
Self-Funded
Tenders Are Invited For Construction Work – Roofing Plumbing Work Ve307
NCB
Western Europe
European Union,G20
09-06-2026

Work Detail

Construction Work – Roofing Plumbing Work Ve307. New Laboratory And Administration Building On The Munich-Neuherberg Campus In Wood Hybrid Construction, Total Property Size Approx. 31,188 M². Gross Floor Area: Approx. 17,200 M²; Ground Floor: Approx. 3,700 M², 1St Floor: Approx. 3,600 M², 2Nd Floor: Approx. 3,550 M², 3Rd Floor: Approx. 1,600 M². Lv Designation: Ve307 Roofing/Plumbing Work Measures On The Main Roofs, Terraces, Loggias And Balconies, As Well As Roofs Above The Basement, Inner Courtyards And Roof Of External Structure Sealing Work: • Vapor Barrier Bitumen Membrane Al+G200s4 With Primer: Approx. 520 M² (Only Inner Courtyards, The Rest Is Available On Site) • Sloped Insulation Layer 1.5-2% Eps: Approx. 4,900 M² • Gradient Insulation Layer 1.5-2% Mw: Approx. 10 M² • Gradient Insulation Layer 1.5-2% Cg: Approx. 250 M² • Roof Sealing Broof 2-Layer Pye-Ktg-Ksp3.5 - Pye/Pyp-Ktps5: Approx. 4900 M² • Roof Sealing Broof 2-Layer Pye-Pv200dd - Pye/Pyp-Ktps5: Approx. 260 M² Green Roof: • Extensive Green Roof: Approx. 2,400 M² • Area Coverage With Gravel: Approx. 1000 M² • Concrete Slab Covering. D 4Cm B 50Cm: Approx. 320 M² Plumbing Work Drainage: • Rainfall Pipes Dn50/Dn70: Approx. 200 M • Horizontal Distortion Rainfall Pipes Dn50/Dn70: Approx. 130 M • Parapet Drains Dn100/Dn70: Approx. 26 Pcs • Balcony/Terrace Drains Dn50/Dn70: Approx. 72 Pcs • Titanium Zinc Gutter: Approx. 14 M Cascade Drainage: • Rainwater Downpipes Dn100/Dn70: Approx. 160 M, • Horizontal Distortion Rainfall Pipes Dn100/Dn70: Approx. 90 M • Attic Drains Dn70: Approx. 8 Pcs Attic Covers: • Attic Cover. Alu D 1.5Mm: Approx. 700 M • Parapet Cover. Aluminum D 1.5Mm: Approx. 200 M Glass Roofs: • Roof Light Strip, Curved L 3.3 M W 3.3 M Pc Translucent: 1 Piece • Light Dome Nshev L 1.4 M W 1.4 M Dark Flap: 1 Piece • Light Dome Nrwg L 1.8 M W 1.8 M Dark Flap: 3 Pieces • Installation Of Ventilation & Smoke Extraction Hood Elevator: 2 Pieces. Other: • Mastic Asphalt: Approx. 10 M² • Photovoltaic System, Solar Mounting Saddle Arrangement: 776 Pieces

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 59f800d1-eb84-45f2-b731-c9d6b2fc63fc.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp