1. The Subject Of The Order Is The Implementation Of The Investment Task Entitled: Reconstruction Of The Sewage Treatment Plant In Ostrowiec.2. The Scope Of Works Includes Reconstruction Of The Existing Sewage Treatment Plant In Ostrowiec On Plot No. 334/1, Ostrowiec Registration Area.3. The Project Is Co-Financed By The Provincial Fund For Environmental Protection And Water Management In Szczecin.4. The Reconstruction Of The Local Sewage Treatment Plant Will Involve The Implementation Of A New Sewage Treatment Technology, I.E. A Mechanical-Biological Sewage Treatment Plant Using The Trickled Biological Bed Technology: 1) Execution Of Demolitions, 2) Construction Of One Technological Line Of Mechanical-Biological Sewage Treatment Devices In Earth Embankments In Accordance With Doc. Design, 3) Construction Of Technological And Inter-Facility Pipelines With Their Infrastructure, 4) Construction Of Area Lighting, 5) Construction Of Electrical And Wlz Installations, 6) Construction Of A Set Of Plots, 7) Hardening Of The Area With 8 Cm Thick Concrete Paving Stones (Tetka Pattern) On Layers Of Cement-Sand Ballast Thick. 5 Cm Of Crushed Aggregate Foundation 0-31.5 Mm C90/3 Gr. 23 Cm And A Sand Drainage Layer Thick. 10 Cm, Including A Concrete Curb On A Concrete Bench With Resistance. 5. Attention! As Part Of This Order, Only One Technological Line Of The Sewage Treatment Plant Should Be Constructed, The Other Technological Line Indicated In The Design Documentation Will Be Built At A Later Date On The Basis Of A Separate Procedure.6. Additionally, The Sewage Treatment Plant Should Be Extended By Expanding The Existing Visualization And Monitoring System Based On Gprs Packet Data Transmission, Which Is Installed And Operates At The Sewerage Network Operator In The Commune. Malechowo. I Would Like To Inform You That Currently The Commune Office In Malechów Uses Software From One Manufacturer To Monitor The Network, Pumping Stations, Compressor Stations And Sewage Treatment Plants. 7. After Completing The Works, A Sewage Treatment Plant Should Be Installed And Launched And The Sewage Treatment Level Should Be Achieved In Accordance With The Regulations And Requirements.8. Due To The Fact That The Existing Sewage Treatment Plant In The Town Of Ostrowiec Is In Continuous Operation, The Contractor Is Obliged To Carry Out The Works In Such A Way As To Ensure Its Functioning And To Treat The Incoming Sewage In Accordance With Applicable Law During The Period Of Works. 9. After Completion Of The Works, Restore The Construction Site To A Condition No Worse Than Before Construction. Provide The Condition Of Municipal Roads In A Condition No Worse Than Before The Investment Commenced.10. It Is Advisable For The Contractor To Visit The Site Of Construction Works In Order To Obtain Information Necessary To Prepare The Offer, Conclude The Contract And Perform The Order.11. The Place Of Disposal Of Excess Soil (Mined Material) Will Be Organized By The Contractor On His
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.