Renovation Of The 1St Wing Of The Elliehausen Rainbow School Harrenacker 1 / 37079 Göttingen Essential Execution Work Is: -20 M Demolition Of Existing Railing, Steel, Including Handrail, Wood, Without Damage To The Subsurface -19 M Railing, Bars, Top Chord, Height 1100Mm, Steel, Powder-Coated -17 M Handrail, Stainless Steel. Diameter 45Mm, Polished, Including Handrail Holder -22 M Supporting Structure For Removable Privacy Elements, Frame, L 7.48M, H 3.03M, Steel -23 M² Privacy Slats, Aluminum, Incl. Uk, Removable Elements -50 M² Support System For Fixed Privacy Elements, Steel, Galvanized, Non-Penetrating -50 M² Privacy Slats, Aluminum, Incl. Uk -30 M² Support System For Privacy Slats In Front Of Ventilation Shafts, Steel, Galvanized, Non-Penetrating -11 M² Privacy Slats For Ventilation Shafts, Aluminum, Incl. Uk -10 M² Support System For Air Conditioning Unit, Galvanized Steel -Static Evidence For The Services Mentioned -Work And Assembly Planning
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.