The City Of Meinerzhagen Intends To Renew The Drainage System And The Traffic Areas Along A Length Of Approx. 320 M On The Unterm Hestenberg Residential Road. The Construction Site Is Located East Of The Center Of Meinerzhagen In The Composers Quarter, In An Extension Of Zum Eickenhahn Street. Sewer Construction - All Services Incurred In Connection With The New Laying Of A Mixed Sewer With Nominal Widths From Dn 250 To Dn 500. Part B - Road Construction - Includes The Renewal Of All Traffic Areas Of The Sidewalks And Roadways. Part C - Meinerzhagen Municipal Utilities - Contains The Proportionate Civil Engineering Work For The Laying Of A Main Water Pipe, Including Renewal And Reconnection Of The Existing House Connections. The Enervie Network Is Connected New Laying Of Low And Medium Voltage Cables Planned In The Future Sidewalk Areas. After The Contract Has Been Awarded, The Utility Company Will Immediately Communicate With The Construction Company About The Upcoming Civil Engineering Work.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.