Preliminary Services-Identification Of The Work-Supply And Placement Of Construction Sign In Plate #26, Preliminary Services-Provisional Installations-Construction Shed, Made Of Resin Plywood, Preliminary Services-Provisional Installations-Fixed Protection Siding For Closing The Work, Preliminary Services-Provisional Installations- Gate For Fixed Protection Siding Protection With Closure, Preliminary Services-Provisional Connections-Provisional Water Connection To Site, Preliminary Services-Provisional Connections-Sewage Connection To Construction Shed On Site, Preliminary Services-Provisional Connections-Provisional Connection With Air Power Input, Preliminary Services-Mobilization And Demobilization-Mobilization And Demobilization Of Work, Structure-Work Location-Work Location With Board Template, Structure Level -200 To Level +90- Pile Driving-Mobilization And Demobilization (Variable Cost), Structure Level -200 To Level +90- Pile Driving-Mobilization And Demobilization (Fixed Cost), Structure Level -200 To Level +90- Pile Driving-Execution Of Piling- (20X20)Cm, Structure Level -200 To Level +90-Pile Driving-Pile Execution-Precast Pile Amendment, Structure Level -200 To Level +90-Pile Driving-Pile Execution-Cutting And Head Preparation, Structure Level -200 To Level +90-Execution Of Pile Block And Starting Pillar- Manual Excavation, Structure Level -200 To Level +90-Execution Of The Pile Block And Starting Pillar- Formwork And Unforming, Structure Level -200 To Level +90-Execution. From Pile Block And Starter Pillar-Cutting, Bending And Assembling, Structure Level -200 To Level +90-Execution. From Pile Block And Starter Pillar-Supply Of Concr, Structure Level -200 To Level +90-Execution Footing And Starter Pillar-Manual Excavation For Block, Structure Level -200 To Level +90-Execution Of Footing And Starter Pillar-Formwork And Plywood Removal, Structure Level -200 To Level +90-Execution Of Footing And Starter Pillar Starting-Cutting, Bending And Assembly Of Steel, Structure Level -200 To Level +90-Execution Of Shoe And Starting Pillar-Manual And Compact Adjustment, Structure Level -200 To Level +90-Execution Of Footing And Starting Pillar-Lean Concrete Ballast, Structure Level -200 To Level +90-Execution Of Footing And Starting Pillar-Concrete Supply Structure, Structure Level -200 To Level +90-Execution Footing And Starter Pillar-Compacted Backfill W/ Plate, Structure Level -200 To Level +90-Execution Beams-Manual Excavation For Baldrame Beam, Structure Level -200 To Level +90-Execution Beams-Manual Regularization And Mechanized Compaction, Structure Level -200 To Level +90-Execution Beams-Formwork And Formwork Of Plasticized Plywood, Esp.12, Adapter For 3-Pin Socket., Structure Level -200 To Level +90-Execution Beams-Cutting, Bending And Assembly Of Ca-50/60 Steel, Structure Level -200 To Level +90-Execution Beams-Waterproofing With Asphalt Emulsion, Two (2) Of, Structure Level -200 To Level +90-Execution Of Slab-Manual Regularization And Mechanized Compaction, Structure Level -200 To Level +90-Execution Of Slab-Formwork And Plasticized Plywood Removal, Structure Of Level -200 To Level +90-Execution Of Slab-Supply Of Structural Concrete, Structure Of Level -200 To Level +90-Execution Of Slab-Cutting, Structure Of Level -200 To Level +90-Execution Slab-Waterproofing With Asphalt Emulsion, Structure Level -200 To Level +90-Execution Backfill And Compaction-Vertical Excavation For Building, Structure Level -200 To Level +90-Execution Landfill