Quotation are invited for Removal of Old MS Pipes, Design, Supply, Installation, Testing & Commissioning of GRE Pipes along with Valves & Accessories for Jebel Ali Tank Tanker Filling Points 1-4. 1.0 SCOPE OF WORKTHE SCOPE OF WORK FOR PIPE REPLACEMENT AT TANKER POINTS INCLUDES THEFOLLOWING:·#REMOVAL OF EXISTING DEFECTIVE MS PI PES (150 MM DIA.) AND DESIGN,SUPPLY, INSTALLATION, TESTING, AND COMMISSIONING OF GRE PIPES (150 MMDIA.) COMPLETE WITH VALVES AND ACC ESSORIES FOR JEBEL ALI TANKER POINTS1, 2, 3 & 4.·#PREPARATION AND SUBMISSION OF SHOP DRAWINGS.·#SUBMISSION OF MATERIAL SUBMITTALS, M ETHOD STATEMENTS, AND OTHERRELEVANT DOCUMENTS AS REQUIRED.·#OBTAINING NECESSARY PERMITS/APPROVALS FROM THE CONCERNED AUTHORITIES,WHE REVER APPLICABLE.·#ARRANGEMENT OF ALL REQUIRED LIFTING EQUIPMENT, SCAFFOLDING, POWERSUPPLY, AND ASSOCIATED RESOURCES NECESSARY FOR E XECUTION OF THE WORKS.FOR FURTHER CLARIFICATION, PLEASE CONTACT MR. NOOR AT (04-3229439 //
[email protected])2.0 PRIOR TO SUBM ISSION OF QUOTATION·#THE CONTRACTOR SHALL VISIT THE SITE AND FULLY FAMILIARIZE THEMSELVESWITH THE SCOPE OF WORK, SITE CONDITIONS, OP ERATIONAL CONSTRAINTS, ANDAVAILABLE FACILITIES PRIOR TO SUBMISSION OF THE QUOTATION.·#NO CLAIMS FOR ADDITIONAL COSTS BEYOND THE AGRE ED CONTRACTRATES/PRICES WILL BE ACCEPTED BY DEWA DURING OR AFTER EXECUTION OF THEWORKS.·#THE CONTRACTOR SHALL EXECUTE THE WORKS IN C OORDINATION WITH THESCHEDULE/PROGRAM PROVIDED BY THE METERING & EQUIPMENT DEPARTMENT.·#THE CONTRACTOR SHALL SUBMIT A DETAILED WORK S CHEDULE/BAR CHARTINDICATING ALL PROJECT ACTIVITIES.·#UPON COMPLETION OF THE WORKS, APPLICABLE INSPECTION CHECKLISTS ANDQUALITY RECOR DS SHALL BE COMPLETED AND SUBMITTED TO DEWA.·#THE CONTRACTOR SHALL PROVIDE ADEQUATE SITE SUPERVISION, COORDINATION,SKILLED MANPOWER, TOOLS, EQUIPMENT, TACKLES, AND ALL OTHER RESOURCESNECESSARY FOR PROPER EXECUTION OF THE WORKS.3.0 TAKE OVER·#A COMPLETION CERTIFICA TE WILL BE ISSUED BY DEWA UPON SUCCESSFUL FINALINSPECTION AND SATISFACTORY COMPLETION OF ALL REQUIRED CONDITIONMONITORING CHECKS, WH EREVER APPLICABLE.4.0 FACILITIES PROVIDED BY DEWA·#ELECTRICITY AND WATER WILL BE PROVIDED BY DEWA AT ONE CONVENIENTPOINT WITHIN THE PLANT. THE CONTRACTOR SHALL ARRANGE ALL NECESSARYEXTENSIONS TO THE WORK LOCATION.·#ANY REQUIREMENT FOR BULK WATER STORAGE SHALL BE A RRANGED BY THECONTRACTOR AT THEIR OWN COST, INCLUDING STORAGE TANKS AND ASSOCIATEDACCESSORIES.NOTE:THE CONTRACTOR SHALL SUBMIT DETAI LED REQUIREMENTS FOR ELECTRICITY Qty: 4 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332601190)/$value