Engineering Design Services – Top_Plusz-6.2.1-23-Ny1-2025-00004_Tervézés_Magas. The Nyíregyházi Zoo Nonprofit Kft. 2026.04. Has A Valid Building Permit And Planning Documentation For The Establishment Of An Ecological, Nature Conservation, Rehabilitation And Rescue Center. The Building Permit Cannot Be Extended. According To The Licensed Plans, The Building Has A Ground Floor + First Floor Layout, With A Total Net Useful Floor Area Of 550 M2. The Customers Requirements Have Changed, The Upper Level Will Be Abandoned, Therefore It Is Necessary To Modify And Reauthorize The Licensed Design Documentation, And Prepare The Construction Design Documentation Based On It. The Contracting Authority Owns The Copyright Of The Plans. As A Design Program And Terms Of Reference, The Contracting Authority Provides The Existing Licensed Design Documentation In Its Entirety. During The Construction, Design Supervision (The Date Of Successful Technical Handover Of The Works According To The Construction Contract Concluded On The Basis Of The Public Procurement Procedure For The Selection Of The Contractor), Professional Support For The Future Construction Public Procurement Procedure(S) Related To The Project, And The Preparation Of Rehabilitation Engineering Certification Are Carried Out. Rehabilitation Engineer Certification Is Provided By Act Xxvi Of 1998 On The Rights Of Disabled Persons And Ensuring Their Equal Opportunities. Act, Act C Of 2023 On Hungarian Architecture And Act 280/2024 On The Basic Regulation Of Town Planning And Construction Requirements. (Ix. 30.) It Is Necessary To Prepare Based On The Provisions Of The Government Decree (Téka). During The Preparation Of The Construction Design Documentation - In Particular, But Not Exclusively - The Following Must Be Complied With: - The Provisions Of The Top_Plusz-1.3.2-23 Call For Tenders, - The Provisions Of Act C Of 2023 On Hungarian Architecture; - 280/2024 On The Basic Regulation Of Town Planning And Construction Requirements. (Ix. 30.) Government Decree (Téka); - Lxix Of 2023 On The Order Of State Construction Investments. To The Provisions Of The Law, • 281/2024 On Construction Authority Procedures And Inspections. (Ix. 30.) As Contained In The Government Decree, • 191/2009 On Construction Contractor Activities. (Ix.15.) Government Decree, • 28/2015 Compiled By The Hungarian Chamber Of Architects. (04.09.) Of The Document Content And Form Requirements Of Architectural And Technical Documentation • 14/2023 Compiled By The Chamber Of Hungarian Engineers. (Vii.14.) Decision Of The Document Regulations For Content And Form Requirements Of Design Documentation Further Details Of The Tasks To Be Performed Are Contained In The Public Procurement Documents. 235/2024 On Environmental Protection Requirements Applicable In Public Procurement. (Viii. 8.) Government Decree Applies In This Procedure. In View Of This, It Stipulates That The Designer Is Obliged To Provide In The Technical Description, As Part Of The System Of Technical Requirements, The Construction Products And Materials To Be Delivered To The Construction Site According To Section 13 (2) Point F) Of The Referenced Legislation
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.