Demolition Of Floor Coverings: From A Piece Of Stone (Demolition Of Tamet Covering), Demolition Of The Concrete Base Under The Floor: From Gravel (Demolition Of The Concrete Sub-Layer (100 Mm) Of Tamet Cover), Removal Of Curbstones: On A Concrete Base, Excavator-Loaded Construction Waste With A Bucket Capacity Of Up To 0.5 M3: Loading, Dump Truck, 17 T Transport Distance - 5 Km. 1St Class Cargo, Construction Of Paving And Leveling Layers Of Foundations: Sand-Gravel Mixture, Coarse Sand, Natural Sand-Gravel Mixture, Construction Of Floor And Leveling Layers Of Foundations: From Sand, Sand, Installation Of Paving Slabs, The Number Of Tiles Laid Per 1M2: 90 Pieces (Installation Of Paving Slabs), Installation Of Concrete Curbstones: On Cement-Concrete Coatings, Installation Of Concrete Curbstones: On Cement-Concrete Coatings (H=400Mm), Galvanized Steel Profiles, Equipped With Guides And Supports.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.