Tenders Are Invited For Renovation Of The Facade Of The Tryńcza Commune Office Building

Tender Detail

113107601
UIB.271.8.2026
Self-Funded
Tenders Are Invited For Renovation Of The Facade Of The Tryńcza Commune Office Building
NCB
central europe
European Union
29-05-2026

Work Detail

1. The Subject Of The Order Is The Performance Of Construction Works Consisting In The Renovation Of The Facade Of The Building Of The Tryńcza Commune Office.2. The Scope Of The Order Includes Construction Works Consisting In The Renovation Of The Facade Of The Building Of The Tryńcza Commune Office In The Area Including Plots Marked With Registration Numbers 875/8 And 875/9 Rev. Tryńcza, Including: 1) Preparatory Works, 2) Disassembly Of Downpipes And Reassembly, 3) Protection Of Windows, 4) Assembly And Disassembly Of External Scaffolding, 5) Preparation Of The Substrate - Cleaning And Washing Of The Facade, 6) Protection Of The Walls With A Fungicide And Strengthening Preparation, 7) Filling Of Gaps In The Walls, 8) Gluing A Layer Of Mesh On The Walls, 9) Making A Thin-Layer Facade Plaster Made Of Silicone Plaster,10) Dismantling The Tile Cladding On The Plinth, 11) Insulating The Plinth With A Polystyrene Board,12) Installing Facade Cladding From Facade Panels,13) Dismantling The Existing Soffit And Installing A New Roof Soffit, 14) Dismantling The Existing Window Sills And Installing New Window Sills, 15) Installing Bird Spikes, 16) Making A Connection To The Irrigation, 17) Making And Installing An Illuminated Logo And Inscription On The Facade.3. A Detailed Description Of The Subject Of The Order Is Specified In The Bill Of Quantities, Technical Specifications For The Execution And Acceptance Of Works, The Façade Concept Constituting Annex No. 7 To The Swz And The Draft Provisions Of The Contract Constituting Annex No. 6 To The Swz.4. Due To The Fact That The Remuneration Will Be A Cost Estimate, The Bill Of Quantities Attached To The Swz Is Binding. The Contractor Is Obliged To Prepare An Offer Cost Estimate Based On The Bill Of Quantities Received From The Ordering Party, Using The Price Base He Adopted For Cost Estimation And After Adding Vat. The Bid Cost Estimate Should Be Consistent With The Bill Of Quantities And Should Include The Basis For The Valuation Of The Works, A Description Of The Works Consistent With The Description Included In The Bill Of Quantities, The Measurements Used In The Bill Of Quantities And A Flat-Rate Net Unit Price For Each Item In The Bill Of Quantities.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document c11557a0-0247-4ce0-9d52-f983782e6c8c.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail

WhatsApp