Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
28-05-2026
Work Detail
Replacement Of Electrical Cables For Automatic Gate At Cbr Main Building . Provision Of Electrical Power Supply For Automatic Gate System, Including Laying Of New 32A Three-Phase (Tpn) Power Supply Using 4 6Mm Pvc Cables With Cpc In Conduit Shall Be Used For Indoor Est. 30M., Installation Of 4 By 4 Pvc Junction Box (32A Rated) As An Intermediate Connection Point For Cable Routing And Distribution. The Junction Box Includes A Power Distribution Terminal Block For A 3 Phase Electrical System And Requires An Ip Rating Of Ip65., Laying Of 5-Core 6Mm Armoured Cable Within G.I. Conduit Pipes From The Junction Box, Routed To The Automatic Gate Isolator, Est. 35M., Carrying Out Hacking Works And Reinstatement For Cable Routing, Including Making Good With Cement Or Brick (If Applicable) Finishes, Est. 20M. All Affected Areas Shall Be Reinstated To Match Existing Finishes., Provision Of Access Equipment Including Mobile Aluminium Tower Scaffolding, And Compliance With Work-At-Height (Wah) Safety Requirements Including Ppe, Risk Assessment (Ra), And Safe Work Procedures (Swp)., Modification Of Existing False Ceiling To Allow Cable Entry And Reinstatement Upon Completion.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.