The Subject Of The Order Is The Performance Of Construction Works Consisting Of: • Renovation Of Parquet Floors In The Main Part Of The Building, • Replacement Of Some Doors In The Rooms Covered By The Works, • Replacement Of Floor Coverings In The Common Room Rooms Located In The Teaching Part Of The Sports Hall, Along With The Performance Of Accompanying And Finishing Works In The Building Of The Primary School No. 127. Henryk Sienkiewicza At Ul. Kowieńska 12/20 In Warsaw, As Part Of The Task Entitled Renovations In Kindergartens, Schools And Educational Institutions. Construction Works Include, Among Others: A) Demolition Works - The Elements Included In The Scope Of Work Should Be Dismantled (Including The Disassembly Of The Existing Carpet, Skirting Boards And Colliding Elements) And The Waste Should Be Disposed Of, B) Parquet Flooring Works - Including In Particular The Renovation Of Parquet Floors (Sanding, Filling, Varnishing Or Oiling - In Accordance With Opz),C) Works Related To The Installation Of Door Joinery - Disassembly Of Existing Doors And Delivery And Installation Of New Doors With Accessories,D) Plastering And Painting Works - Related To The Replacement Of Door Joinery And Reconstruction Of Wall Surfaces, Including The Installation Of Skirting Boards (In Rooms Without The Carpet), E) Works Related To The Replacement Of Floor Coverings, Including: • Disassembly Of The Existing Carpet Along With Removal Of Adhesive Residues, • Preparation Of The Substrate (Cleaning, Local Repairs, Filling Of Gaps), • Making A Leveling Layer (Self-Leveling Screed Up To 5 Mm), • Priming The Substrate, • Delivery And Installation Of Pvc Floor Covering In A Roll, Meeting The Requirements For Educational Facilities, • Cutting And Fitting The Carpet To The Rooms, • Connecting And Welding The Carpet (Using A Welding Rod), • Making Carpet Plinths (Turning On Wall),• Installation Of Threshold Strips,• Cleaning And Tidying Up The Rooms After Completion Of The Work. To Confirm The Required Quality Of The Products Used And The Proper Execution Of The Renovation, It Is Required To Present Material Cards, Certificates, Approvals And Other Documentation Before Installation For Approval. The Materials Should Be Used In Public Buildings, Rooms Intended For Children - Educational Institutions. The Contractor Is Obliged To Exercise Particular Caution When Carrying Out The Works, In Particular To Ensure Appropriate Security And Protection, And To Keep The Construction Site And The Road Leading To It In Good Order. The Contractor Should Take Into Account In Its Offer That: • In The Period Until June 27, 2026 And After August 31, 2026, The Works Will Be Carried Out In An Active Facility, With Works Carried Out In A Maximum Of Two Rooms At The Same Time, Due To The Operation Of An Educational Institution, • During The Summer Break, Works May Be Carried Out In The Entire Facility, From Monday To Friday, From 7:00 A.M. To 7:00 P.M. When Preparing The Work Schedule, The C