1. The Subject Of The Order Is The Implementation Of The Task Titled: Renovation Of The Bridge Structure On Dw 776 Km 46+515 Over An Unnamed Stream In The Town Of Jakuszowice.2. The Scope Of The Order Includes: 1) Dismantling Of All Layers Of The Road Surface On The Bridge And On The Approaches - Approx. 12 M Before And After The Bridge; 2) Dismantling Of Protective Barriers On The Bridge And On The Approaches (3X 12 M + 24 M) And Balustrades On The Bridge; 3) Dismantling Of Sidewalks (Concrete Curbs, Concrete Paving Stones And Edges) On Approx. 12-Meter Sections Of The Access Roads To Bridge;4) Demolition Of Prefabricated Slope Stairs And Concrete Jackets Strengthening The Cones At The Abutments;5) Demolition Of Stone Curbs On The Bridge And Reinforced Concrete Filling Of The Sidewalk Overhangs;6) Removal Of The Deck Insulation;7) Forging Of Cornices And Leveling Concrete On The Spans To Expose The Tops Of The Gromnik Type Beams;8) Excavations Behind The Abutments To The Extent Necessary For Execution Of Transition Plates. Secure The Excavation With Steel Walls Driven Into The Road Axis;9) Note: After Completing The Transition Slabs, The Walls Should Be Left. Walls Protruding 10 Cm Above The Top Of The Transition Slabs Should Be Trimmed; 10) Forging Off The Cornices On The Wings And The Back Walls To The Level Of The Bearing Footings; 11) Cleaning The Exposed Surfaces Of The Concrete Spans And Supports. Forging Corroded Concrete Spans. Removal Of Loose Concrete Fragments;12) Drilling Holes For Embedding The Filter Elements;13) Drilling Holes In The Gromnik Beams, Wings And Bearing Footings And Embedding Reinforcing Bars To Connect The Existing Structure With The Reconstructed Elements;14) Installing The Reinforcement And Concreting The Mating Slab (Concrete Overlay) Of The Spans;15) Installing The Reinforcement And Concreting The Wings And Walls Back-Up To The Level Of The Transition Slabs; 16) Construction Of Transition Slabs With Drainage - A 110 Mm Diameter Pipe Covered With Basalt Grit; 17) Construction Of Foundation Layers On The Transition Slabs; 18) Insulation Of Thermally Weldable Felt Felt. Min. 5 Mm;19) Installation Of Drains And Longitudinal And Transverse Drainage In Place Of The Drains;20) Installation Of Stone Curbs Along The Length Of The Bridge;21) Installation Of Disc Anchors;22) Installation Of Prefabricated Cornice Boards Made Of Polymer Concrete, Reinforcement And Concreting Of Sidewalk Overhangs;23) Installation Of Steel Balustrades Made Of Flat Bars And Protective Barriers On The Bridge;24) Reconstruction Of The Sidewalk On Approaches To The Bridge - Installation Of Concrete Curbs 20X30 Cm, Concrete Edges 8X30 Cm And Concrete Paving Stones. 8 Cm;25) Note: The Use Of Concrete Paving Stones From Demolition Is Allowed;26) Construction Of A Disappearing Sidewalk As Above. From The South-West;27) Laying Thick Insulation Surfaces. 5 Mm On Pavement Overhangs And On The Road The Binding Layer Of Poured Asphalt (Hardened) Thick. 5 C
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.