The Subject Of The Order Is The Construction Of An Internal Road In The Town Of Olbrachtów, No. 155 - Stage Ii. The Order Is To Be Carried Out In Accordance With The Technical Documentation Prepared By The Progamp Paweł Ratuś Design Studio, Ul. Przylep-Gronowa 3, 65-015 Zielona Góra Constituting An Annex To The Swz. Design Documentation Was Developed For The Construction Of The Entire Road Section. This Order Covers The Execution Of Only The Second Stage Of Works (A Section With A Length Of Approx. 480 M). The Scope Of The Task Includes, Among Others: - Construction Of A Road With An Asphalt Surface, 3.0 M Wide And Approx. 480 M Long (Stage Ii), Construction Of Exits And Passing Roads, Hardening Of Aggregate Roadsides With A Width Of 0.50-0.75 M, Profiling Of The Area Along The Works And Green Areas; - Demolition Of The Existing Structure Roadways And Exits, Troughing Up To 70 Cm And Profiling With Soil Compaction, Stabilizing The Ground With Cement, Making A Base From An Unbound Mixture, A Binding Layer And A Wearing Course Of Asphalt Concrete; - Demolition Of Existing Exits To The Property And Construction Of New Ones From Concrete Cubes For All Properties Of Different Widths. We Do Not Rule Out That There Are Entrances To The Property In The Field That Are Not Included In The Documentation, Which Should Be Included In The Offer At The Stage Of Preparing The Offer After A Field Visit; - Construction Of Roadsides Hardened With A Mixture Not Related To Addition Of Basalt Sifting, Leveling And Grassing The Area Along The Road; - As Part Of The Works Being Carried Out, The Obligation To Connect The Existing Exits In Height, Connecting The Road Being Constructed To Existing Roads At The Beginning And At The End Of The Scope Of Work; - Possible Securing Casing Pipes Of The Existing Technical Infrastructure That Does Not Require Reconstruction, - Height Adjustment Of Existing Boxes And Covers Of External Equipment Networks, Raise The Water Supply Valve Housings To The Level Of The Road Surface And, In The Case Of Raising The Terrain, Replace The Valve Shafts With Telescopic Ones; - Perform Other Works Necessary To Complete The Order Resulting From The Developed Technical Documentation; - Perform Post-Construction Geodetic Measurements. The Detailed Scope Of Construction Works Was Specified In The Design Documentation And, Additionally, In The Bill Of Quantities Attached To The Swz. The Contractor Should Read The Documentation In Detail And Make A Local Visit To The Work Site In Order To Properly Prepare The Offer.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.