1. The Subject Of The Order Includes In Particular: Construction Of A Small Architectural Structure In A Public Place - Recreation Area, Power Grid With A Voltage Not Higher Than 15 Kv - Lighting Of The Recreation Area In Borkowo, Commune. Pruszcz Gdański On Plots No. 26/20, 26/19, Registration Unit 220404_2, Pruszcz Gdański, Registration District 0014, Borkowo. Scope Of Work:• Demolition Of The Existing Small Architecture And Its Disposal,• Cleaning Of The Pond, Desilting The Bottom, Removal Of Excess Vegetation (Algae, Weeds),• Construction Of New Walking Paths,• Construction Of Field Stairs,• Construction Of A Fenced Playground In The Western-Northern Part Of The Plot,• Delivery And Assembly Of Small Architecture, I.E.: Benches, Baskets, Outdoor Library, Floating Birdhouse,• Construction Of A Low-Rise Panel Fencing Around The Existing Water Reservoir, • Construction Of Park Lighting Within The Designed And Existing Recreational Infrastructure. The Aim Of The Investment Is To Tidy Up The Space By Supplementing The Elements Of Small Architecture, Securing The Water Reservoir With A Low Panel Fence, Building A Playground With Fitness Equipment And Constructing Alleys - Access To The Newly Designed Elements Of Small Architecture Along With A New Lighting Installation In The Investment Area. The Planned Development Of The Area Assumes The Creation Of A Functional Recreational Zone Located Near The Existing Water Reservoir. In The Western Part Of The Area, A Fenced Playground With Two Fitness Equipment Should Be Built. The Existing Gravel Pedestrian Paths Along The Designed Fence Should Be Supplemented, Creating An Access To The New Area Equipment. Stairs Made Of Paving Stones Were Designed On The Slope Connecting The Existing Alley With The Newly Designed Devices. New Benches With Backrests And Waste Bins Have Been Placed Along The Alleys. An Insect Hotel Was Placed In The Central Point Of The Walking Paths, Close To Existing Trees And Shrubs. An Outdoor Library Is Located Near The Walking Bay In The South-Eastern Part Of The Plot, Thus Defining A Functional Zone - An Outdoor Reading Room. In Order To Increase The Safety Of Users In The Area, New Park Lighting Was Designed And The Existing Water Reservoir Was Fenced Off With A Low Panel Fence. A Floating House For Water Birds Should Be Installed On The Water Body To Enrich The Biodiversity Of The Water Body. The Tank Should Be Cleaned, The Bottom Desilted And Excess Vegetation (Algae, Weeds) Removed. The Existing Communication System Will Be Supplemented With New Walking Paths Around The Designed Equipment. Entrance To The Recreation Area Will Be From Ul. Chestnut. Technical Parameters Of The Network And Land Infrastructure Devices - Construction Of A Lv-0.4Kv -Yakxs 4X25mm2 Cable Line, Construction Of 4.0 M Long Lighting Poles With A 19W Led Luminaire - 10 Pcs.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.