GTR 113042949
Bids Are Invited For Hiring A Specialized Company For The Supply And Installation Of Industrial Evaporative Air Conditioners And High-Flow Exhaust Fans
ICB — International Competitive Bid
Closed
South America
Tender Information
GTR Reference
113042949
Tendering Authority
Subscribe to view
Tender No
17/2026
Financer Name
Self-Funded
Work Title
Bids Are Invited For Hiring A Specialized Company For The Supply And Installation Of Industrial Evaporative Air Conditioners And High-Flow Exhaust Fans
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
South America
Political Region
BRIC,G20
Last Date of Bid Submission
28-05-2026
Closed
Work Detail
Ev 50000 Air Conditioner With Remote Control. Air Flow: 50,000²/H. The Equipment Must Have A High Air Movement Capacity, Suitable For Large Environments That Require Intense Renewal And Circulation. Air-Conditioned Area: 400M² To 500M². Electrical Consumption Of 1.4Kw/H. Low Energy Consumption Equipment Considering Its Flow Capacity, Guaranteeing Efficiency And Operational Savings. Electrical Voltage 220V. Noise: 60Db. Dimensions: Height 180Cm X Width 152Cm X Depth 120Cm, Robust Structure, Designed For Fixed Installation On A Wall Or Suitable Structure. 35 Liter Water Reservoir. Integrated Reservoir For Continuous Operation Of The Evaporatory System, Depending On The Water Stability Of The Site. Highly Durable And Resistant Aluminum Propellers, Ensuring Better Performance When Moving Large Volumes Of Air. Weight 120Kg (Empty). The Complete Installation Of The Equipment Will Be The Full Responsibility Of The Company Winning The Bid, Including: Fixing The Equipment; Adapting The Opening In The Wall According To The Specified Measurements. Electrical Connection; Minimum Flow: 44,000M³/H. The Equipment Must Have Air Renewal And Movement Capacity Compatible With Large Environments, Ensuring Efficient Ventilation. Equipment Dimensions: Height: 1380Cm, Width: 1480Cm, Depth: 450Cm The Above Dimensions Must Be Met Or Exceeded, Allowing Adaptation To The Planned Structure And Ensuring Performance Compatible With The Required Air Volume. General Structure: Cabinet Made Of Resistant Material, Suitable For Continuous Use In Large Environments, Structure Designed To Withstand Vibrations And Prolonged Operation And A Finish That Allows Easy Cleaning And Resistance To Humidity. Ventilation System: Must Have A Fan Assembly Sized To Guarantee A Minimum Flow Rate Of 44,000M³/H, Propellers Or Fans Suitable For Air Flow And Energy Efficiency And A System Designed To Distribute Air Evenly Throughout The Environment. Installation: Complete Installation Of The Equipment Will Be The Full Responsibility Of The Winning Company. The Company Must Provide All Labor, Materials, Tools, Supports, Fixings And Other Items Necessary For The Perfect Operation Of The Hoods; The Installation Must Follow Current Technical Standards, Ensuring Safety, Stability And Operational Efficiency; The Contractor Will Also Be Responsible For The Final Tests And Delivery Working. General Requirements: New, Sealed, First-Use Equipment, Minimum Warranty According To Applicable Legislation And Standards, And Delivery Accompanied By An Installation, Operation And Maintenance Manual.
Key Value
Tender Value
241,537 - BRL
Tender Documents
Global Tender Document
dcf5ae3b-9f0d-4ee8-aa62-09b6e865b84b.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.