Central-Heating Installation Work – Heating Systems - New Depot Building At Am Giebel 46 -. Construction Of Heating Systems For The New Construction Of A Depot On The Site Of The Existing Depot On The Gable 46 Main Components: 1X Wood Chip Boiler With Moving Floor 1X Peak Load Boiler (Liquefied Gas) As Redundancy Approx. 500M Pipe Ad22 Approx. 180M Pipe Ad 28 Approx. 150M Pipe Ad 54 1X Buffer Storage 5000L 1X Buffer Storage 2000L Underfloor Heating: Approx. 1000M Ad 16Mm - 56 Radiators 3X Radiant Ceiling Panels - Hot Water Preparation
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.