Foul-Water Piping Construction Work – Project 20.352A/1 - Tielt-Winge, Collector Houwaart. Project 20.352A/1 - Tielt-Winge, Collector Houwaart. - Sewers Di 250 Up To And Including Di 1000, Depth Class Up To 4 < H <= 5 M. Total 4642 Lm. - Prefabricated Reinforced Concrete Tube 1200 X 600, Depth Class Up To 1 < H <= 2 M. Total 84 Lm. - Prefabricated Reinforced Concrete Tube 800 X 400, Depth Class Up To 1 < H <= 2 M. Total 14 Lm. - Installing 18 Combination Wells. - (Re)Profiling Watercourses. Total 334 Lm. - Realization Of Buffer Basin. - 29 Reinforced Concrete Structures, Including 8 Inlet Structures, 6 Overflow Structures, 2 Drop Tube Structures, 1 Improved Crossing Structure, 8 End Walls, 3 Weirs And 1 Pump Station. - Pressure Pipe Hdpe, Pn10, Sdr11 Du 160. Total 298 M - Jacking Of Pipes Ø250: 12 Lm - Water Management Through Construction Of Temporary (Pressure) Pipes - Electromechanical Works For Pumping Stations - House Connections - Street Gully Connections - Reconstruction Of Roads - Construction Of New Roads - Green Construction And Green Management - Archaeological Research
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.