Excavation Of Soil With Excavators With A Capacity Of 0.5 (0.5-0.63) M3 Of Chalovun By Loading It Onto Dump Trucks, Soil Group: 1, 15T Truck Transport Distance - 5 Km. 1St Class Cargo, Execution Of Works At The Site Of Soil Spillage, Soil Group: 3, Soil Group: 2-3, Filling Pits And Trenches With Bulldozers By Moving The Soil Up To 5 M, Power Of The Bulldozer: 59 (80) Kw (A.G.), 2Nd Group Of Soil, Manual Filling Of Ditches, Pits And Pits, Soil Group: 2, Soil Compaction With Pneumatic Rammers, 2, Construction Of Sub-Bases: Sandy, Construction Of Sub-Bases: Gravel, Preparation Of Concrete Preparation Layer., Fixing The Connecting Layer: Cement, Thickness 20 Mm, Adjustment Of The Joint Layer: Cement, Add Or Subtract To The Norm 11-01-011- 01 For Every 5 Mm Change In The Thickness Of The Joint Layer
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.