1. The Subject Of The Order Is The Implementation Of An Investment Task In The Design And Build Formula Entitled: Construction Of A Sports Complex In Rajgród, Consisting Of, Among Others: On: 1) Construction Of A Sports Complex Consisting Of: 1. Football Pitch With Dimensions Of Min. 30 M X 62 M With A Synthetic Grass Surface, Fenced Around The Perimeter With A Min. Height Fence. 4 M With Barrier Nets With A Height Of Min. 6 M Along The Short Sides Of The Pitch (Area Behind The Football Goals)2. Multi-Purpose Playing Field With Dimensions Of Min. 19 M X 32 M With A Polyurethane Surface, Fenced Around The Perimeter With A Fence Of Min. Height. 4 M.3. Sanitary And Locker Room Facilities - Including A Warehouse For Household And Sports Equipment, Locker Rooms, Sanitary Facilities, A Room For The Facility Manager And An Environmental Trainer,4. Lighting Of The Pitches And The Necessary Lighting Of The Area Around The Pitches Made In Led Technology,5. Small Architecture Objects And Land Equipment, Including: Bicycle Racks, In The Form Of An Inverted U, Enabling Safe And Convenient Attachment Of Two Bicycles To The Frame, Min. 25 Pcs, 6. Stands For Approx. 200 Seats And Technical Infrastructure Necessary For The Implementation Of The Investment.2) As Part Of The Task, The Contractor Will Also Perform, Obtain And Develop:1. Map Of The Land Register And Simplified Extracts From The Land Register For The Plots On Which The Investment Will Be Implemented - 1 Copy, 2. Complete Materials Necessary To Obtain A Decision On The Environmental Conditions Of The Project - 6 Copies (If Applicable),3. Final Decision On The Environmental Conditions Of The Project - 1 Copy (If Applicable), 4. Water Law Report – 3 Copies (If Applicable), 5. Final Water Permit Decision – 1 Copy (If Applicable),6. Complete Construction Design - 5 Copies, Including: - Land Development Design - Architectural And Construction Design - Technical Design - Final Building Permit Decision7. Other Legally Required Arrangements, Opinions And Administrative Decisions Necessary To Complete The Task,8. Acceptance Report, As-Built Documentation With Geodetic Inventory, Combining With Protocols, Admission Certificates, Approvals, Information On The Granted Warranty.9. Investment Implementation Schedule, 10. Work Organization Design, 11. Traffic Organization Design For The Duration Of The Works;12. Health And Safety Plan,13. Plan To Ensure The Quality Of Construction Works Performed,2. The Facility Must Meet The Requirements Of The Orlik Edition 2025 Sports Complex Construction Program (Authored By The Ministry Of Sport And Tourism): Https://Www.Gov.Pl/Web/Sport/Program-Budowy-Komplikow-Sportowych-Orlik--Edycja-2025. It Should Be Noted That From 2030 Onwards, As Part Of The Continued Modernization Programs Orlik 2012 (E.G. Edition 2025/2026), The Surfaces In Orlik Will Be Based On Modern Synthetic Grass (Often Fill-Free, Iv Generation) And Polyurethane, To Be Agreed At The Design Stage With The Ordering
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.