1) The Subject Of The Order Is The Implementation Of An Investment Task Titled: Construction Of Ul. Osiedlowa In Zielonki-Parcela From Ul. Warszawska To Ul. Piaskowa For The Implementation Of Which The Ordering Party Has The Decision Authorizing The Implementation Of A Road Investment No. 303/Zrid/2024 Of May 22, 2024 (Ab.673.24.2023.Ep).2) The Subject Of The Order Includes The Preparation Of Replacement Documentation And The Construction Of A Municipal Road – Ul. Osiedlowa, Approximately 238 M Long (From Ul. Warszawska To The Height Of Property No. 84), Intersection With Ul. Piaskowa, Approximately 43 M Long, And An Intersection With The Road Specified In The Local Development Plan As Kdw4, Approximately 22 M Long. The Replacement Design Is Subject To The Approval Of The Employer And The Designer Responsible For The Authors Supervision. 31 Of June 16, 2014 Of The General Director For National Roads And Motorways); B) Sidewalk: C) In The Strip Of Municipal Roads - Concrete Cubes Of The Behaton Type, Gray Color. 6 Cm, D) In The Strip Of A Provincial Road - Concrete Cubes (Type And Color Should Match The Existing Sidewalk); E) Exits In The Strip Of Municipal Roads - Concrete Cubes Of The Behaton Type, Red Color, Gr. 8 Cm; F) Road Surface On An Elevation - Behaton Type Concrete Cubes, Red, Thick. 8 Cm (Traffic Category Kr2); G) Street Lighting With A Wireless Luminaire Control System - The Contractor Will Prepare And Agree With The Ordering Party The Technical Documentation Of The Above-Mentioned. System. Lighting Fixtures Should Be Equipped With Devices Enabling Wireless Communication Between Individual Fixtures And The Controller Located In The Lighting Control Cabinet, Thus Enabling Remote Control Of Individual Fixtures And Insight Into The Operating Status Of The Fixture. The Luminaire Operation Control System Should Enable, If Necessary, Individual Setting Of The Luminous Flux Level For Each Of The Installed Luminaires. Attention! The Ordering Party Informs That It Has A Schreder Exedra And Lena Lighting (Koolmesh) Lighting Control System, Therefore, As Part Of The Performance Of The Subject Of The Contract, It Requires A Solution Compatible With The One Used By The Ordering Party Without The Need To Use Additional Applications Or Other Solutions; H) Drainage - Storm Sewage: A) Pipeline Diameter 200 Mm, B) Pipeline Diameter 315 Mm, C) Inspection Wells Diameter 1.0 M, D) Absorption Wells Diameter 1.5 M, E) Absorption Wells 2.0 M, F) Infiltration Boxes, G) Sewage Wells Diameter 0.5 M, H) Separators Of Petroleum Substances, I) Linear Drainage; I) Dismantling The Existing Storm Sewage System; J) Reconstruction Of The Telecommunications Network Along With Updating The Technical Conditions; K) Reconstruction Of The Power Network Along With Agreeing On The Design Documentation And Obtaining Conditions For Removing Conflicts At The Network Operator;L) Reconstruction Of Gas Connections Along With Updating The Conditions For Removing Conflicts;M) Constru
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.