1. The Subject Of The Order Is The Implementation Of The Task Titled: Improving The Energy Efficiency Of The Building Of The City And Commune Office In Syców In The Design And Build System. 2. The Order Is Implemented In The Design And Build Formula And Is Divided Into Two Tasks Without The Possibility Of Submitting Partial Offers: Task No. I Is Implemented Under Priority No. 6 European Funds Closer To The Inhabitants Of Lower Silesia Measure No. 6.2 Local Development - Iit Strategies Of The European Funds For Lower Silesia 2021-2027 Program. Task No. Ii A And Ii B Is Implemented From The Syców Communes Own Funds. 3.1. Scope Of Task No. I: A) Design And Cost Estimate Documentation And Stwiorb For The Works Mentioned In Point 1.1. B-Ob) Modernization Of The Central Heating Installation And The Heating Node (Heating System)C) Insulation - Ceiling With Heat Flow From Bottom To Top (Ceiling Under An Unheated Attic (Under A Roof With Tiles))D) Insulation - Flat Roof (Flat Roof - Roofing With Roofing Felt)E) Insulation - Ceiling With Heat Flow From Bottom To Top (Ceiling Under An Unheated Attic - Above Garages)F) Insulation Of External Walls With Heat-Insulating Plaster (Front And External Sides)G) Insulation Of External Walls In The Ground (Basement Walls And Others In The Ground)H) Insulation Of External Walls With Mineral Wool (On The Side Of The Parking Lot And Side Walls, Including Garages)I) Insulation Of The Floor On The Ground (In Basement Rooms)J) Modernization Of External Door Joinery - External Doors K) Modernization Of External Joinery - Garage Doorsl) Modernization Of External Joinery - External Wooden Windows (Front) And Pvc (On The Side Of The Internal Parking Lot) M) Replacement Of Lighting Fixtures With Electrical Installation N) Installation Of A Photovoltaic Installation O) Installation Of A Stair Platform For Disabled People3.2. Scope Of Work For Task No. Ii Aa) Design And Cost Estimate Documentation And Stwiorb For The Works Listed In Point 3.2. B-Eb) Connecting A New Water Supply System To The Building C) Installing An Internal Fire Hydrant System. D) Installation Of A Fire Protection Circuit Breaker E) Fire Protection Separation Staircases And Basementsf) Smoke Exhaust System For Staircasesg) Fire Alarm System - Sspe) Emergency And Evacuation Lighting 3.3. Scope Of Work For Task No. Ii Ba) Design And Cost Estimate Documentation And Stwiorb For The Works Listed In Point 3.3. B-L.B) Replacement Of Parts Of Internal Doorsc) Installation Of Suspended Ceilings In The Corridors Along With The Transfer Of Technical Installations Above The Ceilingd) Renovation Of Terrazzo Floors In The Corridors Of The Ground Floor, 1St Floor, 2Nd Floorse) Renovation Of The Wooden Floor On The 3Rd Floor Of The Buildingf) Renovation Of The Structure And Roofingg) Filling And Painting Of Walls In The Corridorsh) Replacement Of Treads And Stair Risers In Staircasesi) Installation Of Plinths In Corridors And Staircases Staircasej) Renovation Of Office Rooms
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.