Hydraulic Turbines – 73 Brides Les Bains - Turbogenerator Group. Installation Of A New Turbogenerator Group And Associated Adaptation Work, These Include: • Supply O A Pelton Turbine Group: Gross Head: 101 M Net Head At Pmax: 92.6 M Nominal Flow: 1 M/3S Indicative Nominal Power: 820 Kw[Mq1.1] O A Synchronous Alternator: Rotation Speed: 600 Rpm Apparent Power 870 Kva – 400 V O The Oil-Hydraulic Unit (Hpu) • Services O General Studies; O Execution And Sizing Studies Of Equipment; O Gc Adaptation Studies; O Site Installations; O Dismantling Of The Existing Group; O Mechanical Assembly Of The New Group, The Oil-Hydraulic Power Plant, The Various Elements Of Vanework And Piping; O Sealing Of The New Group In The Existing Civil Engineering; O Training Of Edf Personnel; Excluding Contractor Service: • Demolition Work On Existing Civil Engineering • Electrical And Control Work Linked To The Commissioning Of The Group This List Is Not Exhaustive. The Total Scope Will Be Described In Specifications Which Will Be Attached To The Consultation File.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.