GTR 112960371

Request For Quotation Purchasing Spare Parts

ICB — International Competitive Bid Closed Central Asia
Tender Information
GTR Reference
112960371
Tendering Authority
Subscribe to view
Tender No
16979718
Financer Name
Self-Funded
Work Title
Request For Quotation Purchasing Spare Parts
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Asia
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
14-05-2026 Closed
Work Detail
Steam-Waterproof Paper Pv Is A Two-Layer Paper With Bitumen Gluing, The Strength Of The Paper Is 480 Kgf/M (Linear), The T-64 Tank Fine Fuel Filter Section Kit Is A Single Assembly Unit Consisting Of Inlet And Outlet Plates Between Which Filter Material Is Installed. Designed For Fine Cleaning Of Diesel Fuel Before It Enters The High Pressure Fuel Pump. Requirements: Must Ensure A High Level Of Diesel Fuel Purification And Withstand Temperature Changes From -20 To + 50C. Parameters: Input Plates - At Least 10 Pieces, Output Plates At Least 10 Pieces, Filter Material At Least 20 Elements, Operating Temp. Up To 100C. Contents Of One Set: T-64 Fuel Fine Filter Sections - 3 Pieces., Set Of Pipelines For The Cooling System Bts-4 Requirements For Metal Pipes: Materials (Steel 20, 30Khgsa, Aluminum Alloys) Must Have: - Have High Fatigue Strength; - Be Resistant To Internal Corrosion; - Withstand Temperature Changes; - Be Well Welded And Machined; - Have Sufficient Rigidity Of Shape. Main Parameters Of Pipes: Diameter (Internal) 8-57Mm Wall Thickness 1-3Mm Operating Temperature Up To 135°C Pressure (Max.) 0.8 Mpa. Requirements For Flexible Pipelines (Sleeves): Rubber-Fabric Materials Must: - Be Oil And Fuel Resistant; - Maintain Elasticity At Low Temperatures (Up To −40 °C); - Withstand Elevated Temperatures Without Destruction; - Have Reinforcement (Fabric Or Metal) For Strength; - Be Resistant To Cracking And Aging. And Oils Types Of Connections: - Fittings According To Gost; - Union Nuts; - Seal; - Cone-Cone; - Copper Rings. Control And Testing. Pressure Testing: 1.25–1.5 Of The Working Pressure, Tightness Control. Contents: 1-Pipe From Pump 54.02.120Sb-A. 2-Water Drain Valve - 166.02.27Sb. 3-Pipe 54.02.107Sba. 4-Pipe From The Engine To The Coil - 155.02.115Sb-1B. 5-Pipe From The Water Pump - 02/54/45Sb-7B. 6 - Outlet Pipe - 54.02.130Sb-A. 7.-Pipe Connecting To The Tap - 155.02.12.Sb-1. 8-Heater Pipe - 166.02.26Sb. 9 - Heater Pipe - 165.02.13Sb-1A. - 3 Pieces. 10.-Heater Pipe-165.02.14Sb-2. 11- Tube (Oil + Water) From The Oil Tank To The Water Pump. 12. Tube (Oil + Water) From The Tap To The Mzn. 13- Tube From Mzn. 14- Heater Pipe. 15-Pipe From The Water Drain Valve. 16- Tube From The Engine Sump. The Warranty Period For The Operation Of The Equipment Is 12 Months From The Date Of Commissioning., Adhesive Хвк-2А2 Is Intended For Gluing Surfaces Such As Metal, Glass, Wood, Concrete, Leather, Wood. Requirement: Must Have High Adhesion When Gluing Surfaces. Analogue Product Glue 88 Np, A Set Of Pipelines For The Lubrication System Of The T-64 Tank. Requirements For Metal Pipes: Materials (Steel 20, 30Khgsa, Aluminum Alloys) Must: - Have High Fatigue Strength; - Be Resistant To Internal Corrosion; - Withstand Temperature Changes; - Be Well Welded And Machined. Main Parameters Of Pipes: Parameter Value Diameter (Internal) 8-57 Mm Wall Thickness 1-3 Mm Operating Temperature Up To 135°C Pressure (Max.) 0.8 Mpa. Requirements For Flexible Pipelines (Sleeves): Rubber-Fabric Materials Must: - Be Oil- And Fuel-Resistant; - Maintain Elasticity At Low Temperatures (Up To −40 °C); - Withstand Elevated Temperatures Without Destruction; - Have Reinforcement (Fabric Or Metal) For Strength; - Be Resistant To Cracking And Aging. Operating Conditions. Ambient Temperature: From -40°C To +50°C Oil Temperature: Up To 135°C Pressure: - Lubrication System: Up To 0.03 – 0.8 Mpa Impacts: - Vibration; - Dust, Dirt; - Possible Ingress Of Fuel And Oils. Types Of Connections: - Fittings According To Gost; - Union Nuts; - Seal; - Cone-Cone; - Copper Rings. 6. Control And Testing. Pressure Testing: 1.25–1.5 Of The Working Pressure, Tightness Control. . The Set Includes: 1 Oil Hose 432.32.079 Sb 2 Oil Hose 432.32.080 Sb 1. 3 Oil Hose 432.32.081 Sb 1. 4 Oil Hose 432.32.082 Sb 1. . Warranty Period. The Warranty Period For The Operation Of The Equipment Is 12 Months From The Date Of Commissioning. If Defects Are Identified During The Warranty Period, The Company, At Its Own Expense And On Its Own, After Receiving Notification (By Fax Or Mail, Regardless Of Which Comes First), Ensures That The Defects Are Eliminated Within Fifteen Calendar Days., Set Of Pipelines For The Cooling System Of The T-62 Tank Requirements For Metal Pipes: Materials (Steel 20, 30Khgsa, Aluminum Alloys) Must Have: - Have High Fatigue Strength; - Be Resistant To Internal Corrosion; - Withstand Temperature Changes; - Be Well Welded And Machined; - Have Sufficient Rigidity Of Shape. Main Parameters Of Pipes: Diameter (Internal) 8-57 Mm Wall Thickness 1-3Mm Operating Temperature Up To 135°C Pressure (Max.) 0.8 Mpa Requirements For Flexible Pipelines (Sleeves): Rubber-Fabric Materials Must: - Be Oil And Fuel Resistant; - Maintain Elasticity At Low Temperatures (Up To −40 °C); - Withstand Elevated Temperatures Without Destruction; - Have Reinforcement (Fabric Or Metal) For Strength; - Be Resistant To Cracking And Aging. Operating Conditions. Ambient Temperature: From -40°C To +50°C Coolant Temperature: Up To 115°C Pressure: - Cooling System: Up To 0.03–0.5 Mpa Impacts: - Vibration; - Dust, Dirt; - Possible Ingress Of Fuel And Oils Types Of Connections: - Fittings According To Gost; - Union Nuts; - Seal; - Cone-Cone; - Copper Rings. Control And Testing. Pressure Testing: 1.25–1.5 Of The Working Pressure, Tightness Control. Contents: 1. Pipe From Pump 54.02.120Sb-A. 2. Water Drain Valve - 166.02.27Sb. 3. Pipe - 54.02.107Sb-A. 4. Pipe From The Engine To The Coil - 155.02.115Sb-1B. 5.Pipe-155.02.125Sb-A. 6. Pipe From The Water Pump - 02.54.45.Sb-7B. 7. Outlet Pipe - 54.02.130Sb-A. 8. Connecting Pipe With Tap - 155.02.12Sb-1. 9. Heater Pipe - 166.02.26Sb. 10.Tube-155.02.116Sb. 11. Tube - 54.02.123Sb. 12. Heater Pipe - 165.02.13Sb-1A. 13. Heater Pipe - 165.02.14Sb-2. 14. Tube (Double Oil + Water) From The Oil Tank To The Water Pump. 15. Tube From Mzn. 16. Tube (Double Oil + Water) From The Tap To The Mzn. 17. Connecting Tube Of Engine Heads. The Warranty Period Is 12 Months From The Date Of Commissioning.
Key Value
Tender Value
34,144,572 - KZT
Tender Documents
Global Tender Document
5e9cd7ca-b44e-4ce1-9da5-d8e091f78078.html
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders